background image

5 Installation

12

Installation and maintenance instructions auroSTOR 0020221298_04

5.3.2.2 Immersion heater

70

60 50

40

1

3

2

4

1

2

1

Thermal cut-out and re-
set knob for the immer-
sion heater

2

Immersion heater tem-
perature control

5.3.3

Cable route

Use the grommets that are included in the scope of deliv-
ery for the cylinder in the electronics box.

5.3.4

Connecting the immersion heater to the
power supply

70

60 50

40

1

3

2

4

L

N

1

L N

3

2

4

1

2

1.

Remove the cover for the electrics on the cylinder.

2.

Install a separate power supply for the immersion
heater in accordance with the applicable standards.

3.

Use heat-resistant cables for the immersion heater con-
nection.

Diameter of the cable: 1.5 mm

²

4.

Connect the thermal cut-out to the mains power supply
using a double-pole disconnector with a contact gap of
at least 3 mm at both poles.

5.

Protect the electrical circuit using a fuse.

Fuse: 13 A

6.

Connect the immersion heater as shown in the basic
diagram.

7.

Attach the cover for the electrics on the cylinder.

Summary of Contents for auroSTOR VIH S GB 200/3 BES

Page 1: ...lation and maintenance instructions auroSTOR VIH S GB 3 BES GB IE Publisher manufacturer Vaillant GmbH Berghauser Str 40 D 42859 Remscheid Tel 492191 18 0 Fax 492191 18 2810 info vaillant de www vaill...

Page 2: ...unit horizontally 7 5 2 Hydraulic connection 7 5 3 Electrical installation 11 6 Start up 14 6 1 Setting the immersion heater thermostat 14 6 2 Cold water inlet pressure 14 6 3 Setting the thermostati...

Page 3: ...tenance instructions for the product and any other system com ponents installing and setting up the product in ac cordance with the product and system ap proval compliance with all inspection and main...

Page 4: ...orrect tool 1 4 5 Risk of material damage caused by frost Do not install the product in rooms prone to frost 1 4 6 Risk of injury due to the heavy weight of the product Make sure that the product is t...

Page 5: ...appropriate Building Regu lations The Benchmark Checklist can be used to demon strate compliance with Building Regulations and should be provided to the customer for future reference Installers are re...

Page 6: ...tion area Select a sensible installation site and take into consideration the routing of the pipework system Install the cylinder as close as possible to the heat generator in order to minimise heat l...

Page 7: ...and temper ature and pressure relief valve 4 5 Product dimensions 595 638 90 379 317 265 154 B A D C E F Dimensions mm VIH S GB 200 3 BES VIH S GB 250 3 BES VIH S GB 300 3 BES A 1 265 1 535 1 745 B 9...

Page 8: ...and the outlet 2 Installing the solar yield sensor 2 Install the yield sensor on the solar coil outlet close to the cylinder 5 2 2 Connecting the product to the heating circuit 1 Connect the heating c...

Page 9: ...tall the expansion vessel close to the product 2 Install a pipe at the expansion vessel and connect the terminal to the safety assembly 6 5 2 6 Installing a discharge pipe 600 mm 300 mm D2 2 1 D1 1 Te...

Page 10: ...ontact with the waste water and provided that the sys tem is not visible Do not install any valves or stopcocks on the drain pipework Make sure that the discharge pipe from the tundish to the drain ha...

Page 11: ...and N are live Switch off the power supply Secure the power supply against being switched back on Caution Risk of material damage by drilling through the product The product may be damaged by drilling...

Page 12: ...pply 70 60 50 40 1 3 2 4 L N 1 L N 3 2 4 1 2 1 Remove the cover for the electrics on the cylinder 2 Install a separate power supply for the immersion heater in accordance with the applicable standards...

Page 13: ...nctional module 5 3 7 Connecting the control Condition eBUS The thermal cut out for the primary circuit is not used when connecting an eBUS unit Condition 230 V control If you use a 230 V control from...

Page 14: ...eck the immer sion heater in particular 9 Open the highest hot water supply valve and then the lowest hot water supply valve and let the water flow Water running time 5 min 10 Close all of the draw of...

Page 15: ...draw off valve 2 Secure a hose to the drain valve 3 Position the hose at a suitable drain 4 Open the highest hot water tap in the installation 5 Open the drain valve and drain the product completely...

Page 16: ...le 3 Reduce the temperature of the thermostat to 55 C 4 Replace the thermostat Irregular domestic hot water output at the valve 1 Defective expansion vessel 2 Thermal control 1 Set the expansion vesse...

Page 17: ...16 0 kW 15 2 kW Flow rate 900 l h 900 l h 900 l h Pressure loss in the heat exchanger heating circuit 50 mbar 50 mbar 50 mbar Volume of the heat exchanger heating circuit 3 7 l 3 7 l 3 7 l Volume of...

Page 18: ...z 230 240 V 50Hz 230 240 V 50Hz Thermostat 230 240 V 50Hz 230 240 V 50Hz 230 240 V 50Hz IP rating 21 21 21 Technical data Material VIH S GB 200 3 BES VIH S GB 250 3 BES VIH S GB 300 3 BES Cylinder mat...

Page 19: ...Appendix 0020221298_04 auroSTOR Installation and maintenance instructions 19 D Commissioning Checklist...

Page 20: ...UROV KDYH EHHQ WWHG LQ FRPSOLDQFH ZLWK 3DUW RI WKH XLOGLQJ 5HJXODWLRQV Yes Type of control system if applicable Y Plan S Plan Other Is the cylinder solar or other renewable compatible Yes No What is t...

Page 21: ...Date Engineer name Company name Telephone No Comments Signature SERVICE 05 Date Engineer name Company name Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comm...

Page 22: ...n valve 8 Draining the product 15 E Electricity 3 F Filling and purging the heating circuit 14 Filling and purging the product 14 Filling and purging the solar circuit 14 Frost 4 H Handing over to the...

Page 23: ......

Page 24: ...byshire DE56 1JT Telephone 0330 100 3461 info vaillant co uk www vaillant co uk These instructions or parts thereof are protected by copyright and may be reproduced or distributed only with the manufa...

Reviews: