COMMISSIONING
63
6.5.2
Line feed VLS and VNS
NOTICE!
►
The line feeds are preferably installed on a 1 m conductor system section.
Step 1
Assembly steps:
1. Place the feed terminal as close as possible to
the supply line.
To access the feed, the HRL support profile is removed in this area for 600 mm. If the upright, support spacing
> is 1.5 m, an additional auxiliary support must be installed (see installation plan).
Line feed VLS
Step 1
Required tools:
⚒
Screwdriver
Assembly steps:
1. Remove the cover caps from the installed line
feed.
2. Remove the outer insulation of the connecting
cable in the area of the feed.
3. Strip and cut the connecting cable as required.
The additional conductor protection is still given
due to the hollow chamber profile.
Step 2
Required tools:
⚒
Wrench
⚒
Torque wrench
Assembly steps:
1. Attach the cable lugs to the single wires.
2. Place the terminal studs and spacers in the holes
provided for them in the conductor rail.
3. Screw the cable lugs to the terminal studs with
the hexagon screws (M6), spring washers and
hexagon nuts.
Summary of Contents for VKS10
Page 89: ...MAINTENANCE 87 Connecting caps mast assembly before Connecting caps mast assembly after ...
Page 96: ...PROTECTIVE MEASURES 94 10 PROTECTIVE MEASURES 10 1 EU conformity declaration ...
Page 99: ...CE Technical Documentation DQS certified in accordance DIN EN ISO 9001 2015 OHSAS 18001 2007 ...