Vag GA INDUSTRIES Figure 624-D Installation, Operation And Maintenance Manual Download Page 4

 

 

 

Ensure  all  necessary  replacement  parts  are  on  hand 
before  commencing  service.  Disassemble  only  as  far 
as needed to inspect/replace worn parts. 
 

1.  Ensure there is no pressure within the valve 

and operating equipment is locked out. 

2.  Loosen  a  fitting  and  drain  the  oil  from  the 

reservoir  into  a  clean  container  for  re-use 
after  re-assembly.    Note  position  of  closing 
speed  control  valve.    Remove  the  tubing 
between  the  valve  cover  and  reservoir.   
Remove  the  reservoir  mounting  bolts  (24A) 
and the reservoir (24).   

3.  Mark  the  position  of  the  adjusting  stem  (26) 

or  measure  its  height  above  the  top  of  the 
spring chamber (22).    

4.  Loosen the adjusting stem lock nut (25)  and 

turn  the  adjusting  stem  counterclockwise  to 
de-compress  the  spring  until  all  tension  is 
removed. 

5.  Remove  the  spring  chamber  bolts  (28)  and 

remove the spring chamber (22).  
a.  If removing vertically, lift carefully to avoid 

disturbing  the  spring  (23)  then  remove 
the spring guide (27) and spring (23). 

b.  If  removing  horizontally,  it  may  be 

necessary  to 

“tip”  the  spring  chamber 

(22)  so  the  spring  (23)  and  spring  guide 
(27)  are  removed  along  with  the  spring 
chamber (22). 

6.  Mark  the  cover  (2)  and  body  (1)  to  ensure 

proper alignment during re-assembly. 

7.  Remove the cover bolts (20) and remove the 

cover 

from 

the 

body. 

All 

remaining 

components except the body seat (6) should 
come out with the cover.  

8.  Using  a  chain/strap  wrench,  grasp  the  disc 

(3)  around  its  outside  diameter,  loosen  and 
remove  the  disc  stem  nut  (7A).  DO  NOT 
GRASP  THE  STEM  (7)  as  any  scoring  will 
damage the rod wiper (21). 

9.  Remove  the  disc  stem  washer  (7C),  piston 

follower (15), the piston ID seal (16) and the 
piston (12).   

10.  Remove  the  gland  screws  (11A)  and  gland 

(11). 

11.  Extract  the  stem/disc  assembly  from  the 

cover.   

12.  Remove  the  disc  seat  ring  screws  (9),  disc 

seat ring follower (5) and disc seat ring (4).  

13.  Remove the two stem seals (19), lantern ring 

(10) and rod wiper (21). 

14.  Typically,  the  piston  bushing  (14),  upper 

bushing  (8)  and  lower  bushing  (8A)  do  not 
need to be removed as the associated seals 
can  be  replaced  without  removing  these 
components.  

15.  Inspect  all  parts  for  wear  and  damage.  

Replace worn and/or damaged parts. 

 

 
 
 

ASSEMBLY 

The  valve  is  reassembled  by  reversing  the 
disassembly  sequence  with  consideration  of  the 
following: 
 

1a.  Clean  and  polish  all  machined  bearing  and 

sealing  surfaces.  Remove  burrs  and  sharp 
edges.  Apply  a  light  coat  of  lubricant  to 
assist in the assembly. 

2a.  Make sure the hole in the piston follower (15) 

aligns  with  the  pipe  plug  in  the  top  of  the 
piston (12).   

3a.  Be  especially  careful  when  lowering  the 

cover  assembly  into  the  body  to  make  sure 
the cover seal (20) is not damaged.    

4a.  If  spring  chamber  is  vertical,  place  spring 

(23) on piston follower (15) and spring guide 
(27)  on  top  of  spring  (23).    Carefully  lower 
spring  chamber  (22)  over  spring  (23), 
replace  spring  chamber  bolts  (28)  and 
tighten.   

7a.  If spring chamber is horizontal, secure spring 

guide  (27)  to  top  of  spring  (23)  using  duct 
tape or other means.  Slide spring and spring 
guide  into  spring  chamber  until  spring  guide 
(27)  engages  the  adjusting  stem  (26).  
Supporting the spring chamber, bring it up to 
the  cover,  align  bolt  holes,  install  bolts  and 
tighten.    

8a.  Turn  adjusting  stem  (27)  clockwise  until  it  is 

at  original  position,  tighten  adjusting  stem 
lock nut (25).   

9a.  Install  reservoir  (24)  and  re-connect  control 

piping.    Threaded  connections  should  be 
sealed  with  oil-compatible  pipe  sealant,  not 
Teflon  tape.  Open  speed  control  valve  fully 
and  slowly  add  oil  to  reservoir  until  it  is  ¾ 
full.        If  additional  oil  is  needed,  use  non-
foaming AW32 hydraulic fluid.  

10a. Reset  closing  speed  control  to  original 

position. 

 

REPLACEMENT PARTS  

Genuine  replacement  parts  are  available  from  your 
local  VAG/GA  Industries  representative  or  from  the 
factory: 
 
VAG USA, LLC 
234 Clay Avenue 
Mars, PA 16046 USA 
Telephone: 724-776-1020 
Fax: 724-776-1254 
E-mail

[email protected]

 

 

Please have the nameplate data available when 
ordering parts.  Identify needed part(s) by Shop Order 
(SO) Number, Figure Number, valve size and 
individual part number.  
 

 
 
 
 

Reviews: