background image

 

INSTALLATION, OPERATION AND 

MAINTENANCE MANUAL 

 

FIGURE 200 

 

RUBBER FLAPPER CHECK VALVE  

 

TABLE OF CONTENTS 

 

Introduction 

….…………………………

  2 

 

Receiving & Storage 

.....………………

  2 

 

Description of Operation 

.....…………

  2 

 

Valve Construction 

......……………….

  2 

 

Installation  ......

………………………….

  3 

 

Preventive Maintenance 

....…………..

  3 

 

Trouble Shooting 

...……………………

  3 

 

Disassembly 

....…………………………

  3 

 

Reassembly 

....…………………………

.  4 

 

Visual Position Indicator 

..

…………

..   4 

 

Limit Switch Installation/Adjustment 

.   4 

 

Backflow Actuator Installation 

.

.  5 

 

Parts & Service 

………………

..

…….….

  6 

 

Repair Kits 

………………………………

   6 

 

Warranty 

.………………………………..

  6 

 

 

 

 

234 Clay Avenue 

• 

Mars, PA 16046 USA 

Telephone (724) 776-1020 

• 

Fax (724) 776-1254 

E-mail: 

[email protected]

 

  

  

 

Manual Number 200-IOM-110520 

Reviews: