background image

4

9

Dimensions

¾"

¾"

80mm

40mm

80mm

170mm

143mm

145.5mm

70-100mm

Installation

70mm

Finish the wall by tiling up to the 

mortar guard, keep the final finished 

wall surface between the min and max 

marks.
Unscrew the 2 mortar guard screws 

and remove from the wall.

Your valve is now ready to be calibrated.
Please refer to page 11 to ensure your 

valve is calibrated.

Cold

Hot

Outlet 

 2

Outlet 

 1

Connect hot supply to the lower right 

inlet of the valve and cold supply to the  

upper right inlet.
Connect the outlets to the desired 

channels e.g. outlet 1 to the shower 

head and outlet 2 to the handset.

Reviews: