VADO AXCES EKKO AX-EKO-100-CP Installation & User Manual Download Page 4

6

7

Installation

Before installing your new mixer, flush 

through the pipe work to ensure removal 

of debris, turn off the water supply.
Ensure the seal is in place in the bottom 

of the mixer body.
Position the mixer on the basin. From 

the underside of the basin screw the 

two flexible pipes to the hot and cold 

connections in the mixer body, the hot 

should be to the left and the cold to the 

right, hand tighten only. 
Screw the threaded rods into the small 

hole inside the mixer body.
Slide the O-ring and metal washer over 

the rods, the O-ring should fit into the 

groove in the washer. Screw on the nuts 

and tighten to clamp the mixer to the 

basin. 

CAUTION:

 Do not over tighten the nuts as 

this may damage the basin.
Connect the water supply to the inlet 

pipes. The hot water should be connected 

to the left pipe and cold to the right.

CAUTION:

 When 

installing the 

flexible hoses 

do 

not

 kink, or bend  

them more than the 

60mm diameter as 

shown right.

60mm

Installation - Quick guide

 

4

 

5

 

3

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

Control 

handle

Seal

O-ring

Metal 

washer

Nuts

Hot flexible  

pipe

Cold flexible  

pipe

Threaded 

rods

Reviews: