background image

8

9

Installation - Pop-up waste

Dissemble the pop-up waste and 

reassemble onto the basin.
Insert the vertical control rod (with 

knob) down through the hole in the 

back of the mixer body and screw 

into the extension rod.
Unscrew the ball joint retainer 

on the side of the pop-up waste 

body. Insert the short end of the 

horizontal control rod (with ball 

joint) into the waste, slide on the 

clamping washer and clamp in 

position by refitting the ball joint 

retainer. Do not over tighten.
Slide one end of the spring plate 

onto the horizontal control rod, 

followed by the link and finally 

other end of the spring plate.
Slide the control rod link onto the 

vertical control rod and loosely 

tighten.
Test the action of the pop-up 

waste and fully tighten the rod 

link. Adjust the ball joint retainer 

and control rod link as required.
Turn on the water supply and turn 

the mixer on fully to flush through 

any possible debris from the mixer. 

Finally check all new connections 

for leaks.

Lifting the mixer lever 

upwards will increase the 

flow of water.

Moving the mixer lever from 

right to left will increase 

the water temperature. 

Moving the mixer lever from 

left to right will decrease 

the water temperature. 

On

Cold

Hot

Operation - mixer

Operation pop-up waste

Pull the waste control rod up to close 

the plug and fill the basin.

Push the waste control rod down to open 

the plug and empty the basin.

Vertical 

control rod 

extension

Control 

rod

Horizontal 

control rod

Ball joint 

retainer

Clamping 

washer

Control 

rod link

Plug

Plug 

housing

Seal

Seal

Body

Summary of Contents for AXCES AX-MAT-110-CP

Page 1: ...N USER MANUAL This instruction booklet covers model AX MAT 110 CP Version 1 1 9 19 VADO Wedmore Road Cheddar Somerset England BS27 3EB tel 01934 744466 fax 01934 744345 www vado com sales vado com MATRIX MONO BIDET MIXER WITH POP UP WASTE ...

Page 2: ...ulations 1999 and Scottish Byelaws 2004 For further information contact the Water Regulations department of your local water supplier see the WRAS website www wras co uk for details or the Water Regulations Advisory Scheme by email info wras co uk or telephone 01495848454 Before making any inlet pipe connections all supply pipes MUST be thoroughly flushed to remove debris Failure to do so could re...

Page 3: ...122mm 45mm 100mm 1 2 Dimensions Installation Quick guide 1 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 4 5 2 6 3 60mm ...

Page 4: ...ixer body Slide the rubber and metal washer over the rod the rubber washer should be on top Screw on the nuts and tighten to clamp the mixer to the basin CAUTION Do not over tighten the nuts as this may damage the basin Connect the water supply to the inlet pipes The hot water should be connected to the left pipe and cold to the right CAUTION When installing the flexible hoses do not kink or bend ...

Page 5: ... and loosely tighten Test the action of the pop up waste and fully tighten the rod link Adjust the ball joint retainer and control rod link as required Turn on the water supply and turn the mixer on fully to flush through any possible debris from the mixer Finally check all new connections for leaks Lifting the mixer lever upwards will increase the flow of water Moving the mixer lever from right t...

Page 6: ...sed agents or damage caused by foreign objects or substances The extended guarantee is only available if you have completed the Guarantee Registration Process This can be done via the VADO website or via phone to our aftersales team Registration must be completed within 6 months from date of purchase Under the extended guarantee period VADO will at its option offer to supply any replacement produc...

Reviews: