background image

KEEP FOR FUTURE REFERENCE

INSTALLATION / 

USER MANUAL

This instruction booklet covers model:

AX-AST-100/CD-CP,  AX-AST-100-CP,  AX-AST-300-CP

Version 1, 1-9-19

VADO
Wedmore Road,  Cheddar, 
Somerset,  England  BS27 3EB
tel 01934 744466
fax 01934 744345
www.vado.com
sales

@

vado.com 

ASTRA

MONO BASIN MIXER WITH  

POP-UP WASTE

Summary of Contents for AXCES ASTRA Series

Page 1: ...his instruction booklet covers model AX AST 100 CD CP AX AST 100 CP AX AST 300 CP Version 1 1 9 19 VADO Wedmore Road Cheddar Somerset England BS27 3EB tel 01934 744466 fax 01934 744345 www vado com sales vado com ASTRA MONO BASIN MIXER WITH POP UP WASTE ...

Page 2: ...s 1999 and Scottish Byelaws 2004 For further information contact the Water Regulations department of your local water supplier see the WRAS website www wras co uk for details or the Water Regulations Advisory Scheme by email info wras co uk or telephone 01495848454 Before making any inlet pipe connections all supply pipes MUST be thoroughly flushed to remove debris Failure to do so could result in...

Page 3: ...mm 300mm 148mm 151mm 1 2 Dimensions Installation Quick guide 1 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 3 4 5 6 2 60mm ...

Page 4: ... inside the mixer body Slide the rubber and metal washer over the rod the rubber washer should be on top Screw on the nut and tighten to clamp the mixer to the basin CAUTION Do not over tighten the nut as this may damage the basin Connect the water supply to the inlet pipes The hot water should be connected to the left pipe and cold to the right CAUTION When installing the flexible hoses do not ki...

Page 5: ... control rod link onto the vertical control rod and loosely tighten Test the action of the pop up waste and fully tighten the rod link Adjust the ball joint retainer and control rod link as required Turn on the water supply and turn the mixer on fully to flush through any possible debris from the mixer Finally check all new connections for leaks Operation Cold Hot Operation pop up waste Pull the w...

Page 6: ...sed agents or damage caused by foreign objects or substances The extended guarantee is only available if you have completed the Guarantee Registration Process This can be done via the VADO website or via phone to our aftersales team Registration must be completed within 6 months from date of purchase Under the extended guarantee period VADO will at its option offer to supply any replacement produc...

Reviews: