background image

6

7

Installation

Operation

Before installing your new mixer,  flush through the pipework to ensure removal of 

debris, turn off the water supply.

Ensure that the seal is in place underneath of the body.
Position the mixer on the bath. From the underside of the bath fit the rubber 

washers and nuts. Tighten the nuts to clamp the mixer to the bath. 

CAUTION:

 Do not over tighten the nuts as this may damage the bath. 

Connect the water supply to the inlet pipes. The hot water should be connected to 
the left hand pipe and cold to the right.

Hot control 

handle

Rubber 

washer

Nut

Hot inlet

Cold inlet

Seal

Cold

Hot

Cold control 

handle

Rubber 

washer

Nut

Hot tap

 - Turning the handle clockwise will increase the water temperature.  

Cold tap

 - Turning the handle anti-clockwise will decrease the water temperature. 

Reviews: