VADO ALTITUDE TAB-128/3WO-ALT-CP Installation Manual Download Page 7

12

13

Installation

Finish the wall by tiling up to the 

mortar guard, keep the final finished 

wall surface between the min and max 

marks.
Unscrew the 2 mortar guard screws 

and remove from the wall.

Your valve is now ready to be 

commissioned.
Please refer to page 15 to ensure your 

valve is calibrated.

Screw the three shrouds onto the valve.

Cold

Hot

Outlet 

 2

Outlet 

 1

Handset 

outlet

Connect hot supply to the lower right 

inlet of the valve and cold supply to the  

upper right inlet.
Connect outlet 1 & 2 to the desired 

channels e.g. outlet 1 to the shower 

head, outlet 2 to the bath. 

Note:

 outlet 3 will be connected to the 

handset.

Mortar 

guard

Mortar guard 

screws

Installation - trim

Temperature handle (middle)

  

Ensure the temperature handle is correctly 

located with the handle stop at 12 o’clock 

(see right). Carefully slide the handle on 

the splines, secure with the grub screw and 

insert rubber cap in hole. 

Flow handles (left and right)

 

With the handle pointing up in the off 

position carefully slide onto the splines, 

secure with the grub screw and insert 

rubber cap in hole.   

Handle stop at 

12 o’clock

Inside of temperature handle

The handset holder has slight adjustment. First guide the handset holder 

partially onto the spigot and then slide the cover plate over the shrouds.

  

Push the cover plate up to the wall and tighten the two grub screws on the 

underside of handset holder to secure it to the spigot. Apply a thin bead of silicone 

around the outside to seal against the tiled surface. 

Flow Handle 

with rubber cap

Cover 

plate

Flow Handle 

with rubber cap

Temperature Handle 

with rubber cap

Handset holder

Spigot

Summary of Contents for ALTITUDE TAB-128/3WO-ALT-CP

Page 1: ...for future reference Installation Guide ALTITUDE where inspiration flows Vado Wedmore Road Cheddar Somerset England BS27 3EB tel 01934 744466 fax 01934 744345 aftersales vado com www vado com This in...

Page 2: ...99 and Scottish Byelaws 2004 For further information contact the Water Regulations department of your local water supplier see the WRAS website www wras co uk for details or the Water Regulations Advi...

Page 3: ...4 5 Contents of Packaging Shower hose with 2 washers Handset Hex key Rubber caps x 3 Adaptors to x 4 Dimensions 95mm 80mm 80mm 40mm 80mm 370mm 306mm 125 5mm 75 100mm...

Page 4: ...6 7 Installation Quick guide 1 2 77mm 263mm 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 3 90mm Installation Quick guide 4 5 1 2 3...

Page 5: ...8 9 Installation Quick guide Installation Quick guide 8 9 6 7 x 1 x 3 x 3...

Page 6: ...all shown in minimum position Installation Flush pipe work thoroughly before fitting the valve Warning Please check for any hidden cables and pipes before drilling holes in the wall The valve must be...

Page 7: ...sure the temperature handle is correctly located with the handle stop at 12 o clock see right Carefully slide the handle on the splines secure with the grub screw and insert rubber cap in hole Flow ha...

Page 8: ...the calibration of the valve to suit individual requirements of the installation 1 Check the temperature of the water being delivered to the outlet with a thermometer when the handle is located at 12...

Reviews: