![VADO ALTITUDE TAB-128/3WO-ALT-CP Installation Manual Download Page 7](http://html1.mh-extra.com/html/vado/altitude-tab-128-3wo-alt-cp/altitude-tab-128-3wo-alt-cp_installation-manual_3143904007.webp)
12
13
Installation
Finish the wall by tiling up to the
mortar guard, keep the final finished
wall surface between the min and max
marks.
Unscrew the 2 mortar guard screws
and remove from the wall.
Your valve is now ready to be
commissioned.
Please refer to page 15 to ensure your
valve is calibrated.
Screw the three shrouds onto the valve.
Cold
Hot
Outlet
2
Outlet
1
Handset
outlet
Connect hot supply to the lower right
inlet of the valve and cold supply to the
upper right inlet.
Connect outlet 1 & 2 to the desired
channels e.g. outlet 1 to the shower
head, outlet 2 to the bath.
Note:
outlet 3 will be connected to the
handset.
Mortar
guard
Mortar guard
screws
Installation - trim
Temperature handle (middle)
Ensure the temperature handle is correctly
located with the handle stop at 12 o’clock
(see right). Carefully slide the handle on
the splines, secure with the grub screw and
insert rubber cap in hole.
Flow handles (left and right)
With the handle pointing up in the off
position carefully slide onto the splines,
secure with the grub screw and insert
rubber cap in hole.
Handle stop at
12 o’clock
Inside of temperature handle
The handset holder has slight adjustment. First guide the handset holder
partially onto the spigot and then slide the cover plate over the shrouds.
Push the cover plate up to the wall and tighten the two grub screws on the
underside of handset holder to secure it to the spigot. Apply a thin bead of silicone
around the outside to seal against the tiled surface.
Flow Handle
with rubber cap
Cover
plate
Flow Handle
with rubber cap
Temperature Handle
with rubber cap
Handset holder
Spigot