![vacuubrand CVC 2 Instructions For Use Manual Download Page 19](http://html1.mh-extra.com/html/vacuubrand/cvc-2/cvc-2_instructions-for-use-manual_847898019.webp)
page 19 of 36
Documents are only to be used and distributed completely and unchanged. It is strictly the users´ responsibility to check
carefully the validity of this document with respect to his product. manual-no.: 99 90 20 / 01/12/2004
After setting the basic setup:
☞
The symbol of the cooling water valve is displayed and ”yes”
or ”no”.
➨
Press key p
▲
or p
▼
to activate (”yes”) or to inactivate (”no”)
the cooling water valve and press key START/STOP to con-
firm.
☞
The cooling water valve 24 V= at the controller is operated
parallel (synchronous) to the cooling water valve at the VMS
Module A.
☞
The controller is now ready for operation (process control inactive).
☞
The
isolation valve
is identified automatically.
☞
If it is missing in basic setup Standard or Management
Plus, the process control cannot be started,
respectively is stopped.
☞
If it is missing in basic setup Management or VACUU•LAN, the valve symbol is not displayed.
Set