VDH-CK800 Hardware Manual
4
Inside check
In addition to checking for visible signs of damage, be careful to check the
connections between the front panel data cable, power cord and
motherboard.
D.
Installation
Steps and cautions:
1、Room temperature below 35℃
2、Reserve space for air circulation around 15 cm (6 inches)
3、Chassis installation starts from bottom to up
4、With multiple components in the chassis, take precautions to avoid
overloading to the power outlet.