MANAGED SWITCH
Chapter 2 Installing and Connecting the Switch
2.1 Installation
Ø
Put the switch in a stable place such as a desktop to avoid falling.
Ø
Ensure the switch works in the proper AC input range and matches the voltage labeled.
Ø
Do not open the switch’s outer case even in the event of power failure.
Ø
Ensure there is proper heat dissipation from and adequate ventilation around the switch.
Ø
Ensure the switch’s location can support the weight of the switch and its accessories.
2.1.1 Desktop Installation
Attach the cushioning rubber feet provided on the bottom corners of the switch to protect against external
vibration. Allow adequate space for ventilation between the device and any objects around. i
Figure 4 - Desktop Installation
2.1.2 Rack-mountable Installation in 19-inch Cabinet
Bracket Installation
A.
Use the screws provided with the equipment rack to mount the Switch on the rack and tighten it.
Summary of Contents for MPEGS24
Page 1: ...USER MANUAL Managed Switch MPEGS24...
Page 10: ...MANAGEDSWITCH...
Page 11: ...MANAGEDSWITCH 4 1 3 Traffic Statistics...
Page 15: ...MANAGEDSWITCH address from DHCP Server 4 2 5 IGMP Snooping Network IGMP Snooping...
Page 16: ...MANAGEDSWITCH 4 3 Port Configuration 4 3 1 Port Configuration...
Page 19: ...MANAGEDSWITCH 4 3 4 ACL ACL Bounding List This page allows you to set port bounding ACL rules...
Page 23: ...MANAGEDSWITCH 4 5 2 PVID VLAN ID for the selected ports...
Page 25: ...MANAGEDSWITCH 4 6 2 Power Priority...
Page 26: ...MANAGEDSWITCH 4 6 3 Power Supply POE Configuration Power Supply...
Page 27: ...MANAGEDSWITCH 4 6 4 Power Limitation POE Configuration Power Limitation...
Page 28: ...MANAGEDSWITCH 4 6 5 PoE Status...