V-TAC VT-81010 Instruction Manual Download Page 3

INSTALLATION

WIRING DIAGRAM

SENSOR INFORMATION

TEST

•  Turn the TIME knob anti-clockwise on the 

minimum (10S). Turn the LUX knob clock-

wise on the maximum (sun).

•  Switch on the power; the sensor and its 

connected lamp will have no signal at the 

beginning. After Warm-up 30sec, the sen-

sor can start work. If the sensor receives the 

•  Switch off the power.

•  Unload the transparent cover.

•  Connect the power to connection terminal of sensor according to connection-wire diagram.

•  Install back the transparent cover into the original location.

•  Fold the metal spring of the sensor upwards and then put the sensor into the suitable hole or 

installation box. Releasing the spring, the sensor will be set in this installation position.

•  After finishing installing, turn on the power and then test it.

Height of Installation: 1.8-4m

DETECTION DISTANCE: Max. 8m

Reviews: