Load
PACKAGE DESCRIPTION
TOOLS REQUIRED FOR INSTALLATION
INSTALLATION STEP
Object
Description
A
Inverter
B
Base
C
Battery box*2
D
Battery*6 (optional)
E
Wire rod
Object
Description
F/G
Expansion screws and
hexagonal screw
H
Wi fimodule (optional)
I
GPRS module (optional)
J
User manual
K
CT
Installation tools : crimping pliers for binding post and RJ 45, screwdriver, manual wrench etc
Step 1:Fixing the bottom with the battery box 1, using 8 M5*12 screws
Step 2: The battery box 2 fixed. Align the lower notch of battery box 2 with the upper guide
of battery box 1, lower it and push it to the right . Facilitate pushing to the right, the coil can
be removed before assembly.
The coil
Rail