INSTALLATION:
• Provide power to the required point of installation,
• Cut a suitable aperture in the ceiling as per the cut-out details in Fig 1 ensuring that it
does not infringe with electrical cables, water/gas pipes or ceiling joists
• Connect the battery to the inverter via the plug and socket provided
• Connect the live and neutral to the push fit terminals on the PCB of the inverter (Fig 3)
• Remove 2 screws on top of the fitting (see Fig 2)
Fig1
Fig2
Remove screws
Cable entry point