
Operation
34
5.3.12 Power grid control
Run Param
Grid Ctrl
* * * *
Operating parameters setting
5 4 3 2
Power grid control
P%-Feed: 100.0%
P-Feed: 5000W
1. The inverter sends electricity
to the power grid percentage.
2. The inverter is sent to the power
grid power.
5.3.13 Multi-machine in Parallel
Com Param
COM4 Parallel
Communication parameters setting
Meter
Bat
Parallel
Sunspec
Modbus