1
Assembly
Beny Sports Co. UK Ltd
Unit 8, Riparian Way,
The Crossings, Cross Hills,
West Yorkshire.
BD20 7BW
Carefully unpack each component, checking against the parts list that
you have all the necessary parts to complete the assembly of your
product.
Please note that some of the parts may be pre-fitted to major
components, so please check carefully before contacting our
CUSTOMER SUPPORT team.
In any event, please do not return the product to your retailer before
contacting us first.
Do NOT FULLY TIGHTEN any
Bolts, Nuts or Fittings at this
stage unless specifically
instructed to do so.
Note
Tel:- 0800 3 101 202 or
+44 (0) 1535 637711
Email:- [email protected]
Website: www.benysports.co.uk
CUSTOMER SUPPORT is open from 9.00am to 5.00pm from Monday
to Friday
Assemble the Front and Rear Stabilizer (50 & 65) to the Main Frame using 4 x M8 x 75mm
Carriage Bolts (51), 4 x M8 Curved Washers (5), 4 x M8 Spring Washers (6) and 4 x M8
Dome Nuts (7) for each Stabilizer. Tighten all Bolts and Nuts securely.
51
51
5
6
7
50
66
52
53
7
6
5
51
51
65
Page
1
6