7
7
INSTALLATION INSTRUCTIONS
Garage Gorilla Motorized Storage Unit
Step 1
Determine motor mounting plate location on the ceiling
Choose a location in your garage where you would like to install your Garage
Gorilla model GG220 – an unobstructed operating space of at least 3 feet by 9
feet is required. The motor mounting plate (A) should be installed at least 3
feet away from walls or any other obstructions.
The GG220 is designed to be installed either perpendicular or parallel to the
ceiling joists and can be installed on joists with 16” or 24” spacing.
Select an installation location close to a power supply (preferably a ceiling outlet).
In the chosen installation area determine the direction of the ceiling joists and
the exact location of the ceiling joists by visually checking or using a stud finder
or a very fine drill bit.
Four installation options are illustrated below. Note how the motor mounting
plate (A) and motor hoist (B) are positioned for your installation – in particular
the location of the 4 fixed, threaded bolts on the motor mounting plate and the 4
½” spacer channel bar attachment tab on the motor hoist.
OPTION
A
OPTION
B
OPTION
C
OPTION
D
Ï
Perpendicular To Joist Installations
Ð
Ï
Parallel To Joist Installations
Ð
7
INSTALLATION INSTRUCTIONS
Garage Gator Motorized Storage Unit
Step 1
Determine motor mounting plate location on the ceiling
• Choose a location in your garage where you would like to install your Garage Gator
model GGR125 - an unobstructed operating space of at least 3 feet by 4 feet is required.
The motor mounting plate (A) should be installed at least 3 feet away from walls or any
other obstructions.
• The GGR125 is designed to be installed either perpendicular or parallel to the ceiling
joists and can be installed on joists with 16” or 24” spacing.
• Select an installation location close to a power supply (preferably a ceiling outlet).
• In the chosen installation area determine the direction of the ceiling joists and the exact
location of the ceiling joists by visually checking or using a stud finder or a very fine drill
bit.
• Four installation options are illustrated below. Note how the motor mounting plate (A)
and motor hoist (B) are positioned for your installation - in particular the location of the 4
fixed, threaded bolts on the motor mounting plate and the 4 1/2” spacer channel bar
attachment tab on the motor hoist.
Motor
Mounting
Plate
Motor
Hoist
Location of Four,
Fixed, Threaded,
Bolts - on Motor
Mounting Plate
4 1/2” Spacer
Channel Bar
Attachment Tab
- on Motor Hoist
Channel
Bars
Perpendicular To Joist Installations
Parallel To Joist Installations