Installation
!
Unscrew bolts from Press Block at the front part of the housing.
!
The upper part and two bolts can be set aside, then must be added back after the TTL circuit is installed.
!
(Optional):
In case of using Electric Wire Synchronization, connect Electric Bulkhead cable to 4-pin socket on the TTL-
Converter board.
!
Install two white metal spacers into recesses of the bottom part of Press Block.
!
Install TTL-Converter on the top of Press Block part. Screw two long bolts through the holes.
!
IMPORTANT!
Insert both LEDs maximum deep into the optical bulkheads by any tool. The LED must be maximum close
to transparent optical element inside the bulkhead to get normal TTL accuracy. Bend LED wires as necessary.
!
Insert batteries into TTL-Converter. Before installation check that “plus” terminal of each battery is in Up position.
!
Install upper part of Press Block, screw the bolts.
Optional Accessories
!
UW Technics #91340 Nikonos style Bulkhead (M14 screw) with flat cable and 4-pin MicroMatch connector.
!
UW Technics #91341 Ikelite style Bulkhead (M14 screw) with flat cable and 4-pin MicroMatch connector.
!
UW Technics #91342 S-6 style Bulkhead (M14 screw) with flat cable and 4-pin MicroMatch connector.
!
Bulkheads are optional products and must be purchased separately.