USLR-XLT Field Inspection (1-14-19)
Copyright © 2019 Utility Solutions, Inc.
Hook Loop
Clip Assembly
Hot Stick
Attachment
Yellow Tube
(inside)
Black Top Ring
USLR-XLT-1
Maximum Voltage Rating 27kV
USLR-XLT-2
Maximum Voltage Rating 38kV
Muffler Cap
(exhaust)
Reset Button
Control Arm
Lower External
Conductor Path
Hot Stick
Alignment Guide
FIELD INSPECTION PROCEDURE
LOAD-RANGER® XLT Portable Load Break Tool
Upper External
Conductor Path
ATTACHMENT GUIDE:
• The LOAD-RANGER
®
XLT Portable Load Break Tool requires reaching across
the face of the cutout/switch at an angle. The bottom of the black tube should
angle in towards the cutout/switch slightly.
• Always approach the cutout/switch from below. A 45° angle below horizontal is
recommended.
• Approach the cutout/switch from the side that is least congested and avoids
contact with other equipment.
• Always reach across the front of the cutout/switch with the tool. Never attach the
tool on the same side of the cutout/switch as you approach.
• Attach the hook loop over the arcing horn on the opposite side from your position.