INSTALLATION PROCEDURE
replacement of another appliance such as a water heater.
The boiler shall be installed such that the oil ignition system
components are protected from water (dripping, spraying,
rain etc.) during appliance operation and service.
FOR INSTALLATION ON NON-COMBUSTIBLE FLOORS
ONLY - The boiler must not be installed on carpeting or
vinyl flooring. Minimum clearances to combustible construc
-
tion are:
TOP
24 IN.
FRONT
24 IN.
FLUE CONNECTOR
9 IN.
REAR
24 IN.
LEFT SIDE
6 IN.
RIGHT SIDE
24IN.
NOTE:
Clearance for access should exceed fire protection
clearance.
All installations must conform to the requirements of the
authority having jurisdiction. Such applicable require
-
ments take precedence over the general instructions of this
manual.
Where required by the authority having jurisdiction, the in
-
stallation must conform to the American Society of Mechan
-
ical Engineers Safety Code for Controls and Safety Devices
for Automatically Fired Boilers, ANSI/ASME No. CSD-1.
Locate boiler in front of final position before removing crate.
Provide a level solid base as near chimney as possible and
centrally located with respect to the heat distribution system
as practical.
Boiler may not be installed on combustible
flooring!!
WARNING
!
Allow 24 inches in the front, top and right hand side for
servicing and cleaning, or removing tankless water heating
coil.
It is recommended that 24 inches be allowed in back of
boiler for convenience when skimming hole is used.
When installed in a utility room, the door should be wide
enough to allow the largest boiler part to enter, or to permit
Improper installation, adjustment, alteration, service or maintenance can cause injury or property
damage.
WARNING
!
Minimum clearances to combustible
construction
(as seen from above)
6"
24"
24"
BOiLER
24"
Figure #2