57
11.1 Beginning of Each Heating Season
• Check boiler area is free from combustible materials,
gasoline, and other flammable vapors and corrosive
liquids.
• Visually inspect combustion air and vent piping
for proper operation. Check for and remove any
obstruction to flow of combustion air or vent
gases. Immediately repair or replace pipe showing
deterioration or leakage. Reassemble per instructions
in section 5. Ensure proper reassembly and resealing
of system.
• Visually inspect condensate drain line for proper
operation. Checking for deteriorated or plugged
condensate drain line. Verify condensate trap drains
freely and clean as required.
• Test safety relief valve for proper operation. Refer to
valve manufacturer's instructions packaged with relief
valve.
• Examine heat exchanger, burner, condensate lines, and
clean (if necessary) by following instructions in section
11.3 - Component Replacement And Cleaning.
CAUTION
Label all wires prior to disconnection when
servicing controls. Wiring errors can cause
improper and dangerous operation.
!
!
DANGER
Before servicing, turn off electrical power to
boiler at service switch. Close manual gas valve
to turn gas supply OFF to boiler. Failure to
comply will result in death or serious injury.
!
Note
V
erify proper operation after servicing.
Note
Perform regular service and maintenance
by qualified service agency at least once
every 12 months to assure safe, trouble
free operation and maximum efficiency.
• Circulator pump and combustion air blower motor
furnished with boiler are permanently lubricated from
factory and require no further lubrication. Lubricate
field sourced pumps and/or motors according to
pump and/or motor manufacturer’s instruction.
• Check following components are operating properly
and are free of blockages or obstructions:
• air vent;
• check venturi air inlet for blockage and clean as
required;
• verify pressure test port cap and combustion test
port caps are in place;
• verify supply and return sensors are properly
clipped to pipes as close to heat exchanger as
possible;
• Check boiler for any sign of leaks.
•
Check external low water cutoff operation (if
installed).
• Check operation by pressing test button on low
water cutoff.
• "Low Water" LED on the external LWCO should
illuminate and boiler should shut down.
•
Every 5 years remove low water cutoff. Reinstall
after cleaning.
•
Every 10 years replace low water cutoff.
•
Visual inspection of flame through sight glass. Burner
should be fully illuminated.
• Check heating system expansion tank.
Note
A Heat Exchanger cleaning kit is available
for annual service of the boiler. See repair
parts manual for part number.
11 - GENERAL MAINTENANCE AND CLEANING
240013371 REV B, [10/01/2021]
Summary of Contents for MACF-115
Page 2: ...MACF 150 ...
Page 4: ...MAHF 125 ...
Page 74: ...70 A 1 MODEL 100 Heat Only APPENDIX A WIRING DIAGRAMS 240013371 REV B 10 01 2021 ...
Page 75: ...71 A 2 MODEL 125 Heat Only APPENDIX A WIRING DIAGRAMS 240013371 REV B 10 01 2021 ...
Page 76: ...72 APPENDIX A WIRING DIAGRAMS A 3 MODEL 165 Heat Only 240013371 REV B 10 01 2021 ...
Page 77: ...73 APPENDIX A WIRING DIAGRAMS A 4 MODEL 115 Combi 240013371 REV B 10 01 2021 ...
Page 78: ...74 A 5 MODEL 150 Combi APPENDIX A WIRING DIAGRAMS 240013371 REV B 10 01 2021 ...
Page 79: ...75 A 6 MODEL 205 Combi APPENDIX A WIRING DIAGRAMS 240013371 REV B 10 01 2021 ...
Page 80: ...76 NOTES 240013371 REV B 10 01 2021 ...
Page 81: ...77 NOTES 240013371 REV B 10 01 2021 ...
Page 82: ...78 NOTES 240013371 REV B 10 01 2021 ...
Page 117: ...33 MODEL 100 Heat Only 100 HEAT ONLY WIRING DIAGRAM PN 240012875 REV C 10 01 2021 ...
Page 118: ...34 MODEL 125 Heat Only 125 HEAT ONLY WIRING DIAGRAM PN 240012875 REV C 10 01 2021 ...
Page 119: ...35 MODEL 165 Heat Only 165 HEAT ONLY WIRING DIAGRAM PN 240012875 REV C 10 01 2021 ...
Page 120: ...36 115 COMBI WIRING DIAGRAM MODEL 115 Comb PN 240012875 REV C 10 01 2021 ...
Page 121: ...37 MODEL 150 Combi 150 COMBI WIRING DIAGRAM PN 240012875 REV C 10 01 2021 ...
Page 122: ...38 MODEL 205 Combi 205 COMBI WIRING DIAGRAM PN 240012875 REV C 10 01 2021 ...
Page 127: ...43 LOW WATER CUTOFF DETAIL LOW WATER CUTOFF NO NO YES PN 240012875 REV C 10 01 2021 ...
Page 132: ...48 3 FAULT SOLUTION SECTIONS PN 240012875 REV C 10 01 2021 ...