background image

17

USSC

PARTS DIAGRAM AND LIST

Key Description

Part #

Qty

1

Grate Retainer

40312

2

2

Shaker Bar

891341

1

3

Shaker Grate Section

40314

5

4

Front Liner

40344

1

5

Back Liner

40313

1

6

Full Firebrick (4-1/2 wide x 9 tall x 1-1/4 thick)

89066

16

7

Half Firebrick (2-1/4 wide x 9 tall x 1-1/4 thick)

891414

3

8

Slide Baffle

24231

1

9

Baffle Rod

86662

1

10

Inside Cover Plate

24220

1

11

Gasket, Water Coil Cover

C97999

1

12

#12 x 3/4: Tek Screw

C23799

3

13

Carriage Bolt, 1/4-20 x 1-1/4 Long

83445

2

14

Smoke Door Clip

23787

2

15

Kep Nut, 1/4-20

83250

2

16

Smoke Curtain

23800

1

17

Door Handle

891884

2

N/S

Lock Nut, 1/2-13

83444

2

N/S

Washer

83835

2

18

Feed Door Latch

23786

1

19

Feed Door Assy. (w/Rope Gasket)

69653

1

20

Shaker Handle

69005

1

21

Bracket, Shaker Handle

24204

1

22

Ash Door Latch

23823

1

23

Ash Pan

68882

1

24

Carry Handle

24233

1

25

Ash Door Assy. (w/Rope Gasket)

68880

1

26

Draft Cap

23859

2

27

Outer Side Wall, Left

25715

1

28

Panel-L, inner Cabinet

25746

1

29

Clip, Outer Wall

25718

2

30

Bracket, Alignment

25719

2

31

Cabinet Door Stop

25720

1

32

Insulation, Cabinet Side

88149

4

33

Outer Side Wall, Right

25715

1

34

Panel-R, inner Cabinet

25717

1

35

Harness, 2 Circuit Plug

80587

1

36

Filler, Top

25721

1

37

Hood, Front

25744

1

38

Assembly, Cabinet Back

69647

1

39

Insulation, Back

88153

1

40

Insulation Holder

83884

16

Key Description

Part #

Qty

41

Inner Top

25726

1

42

Insulation, Top-Front

88150

1

43

Insulation, Top-Middle

88151

1

44

Insulation, Top-Rear

88152

1

45

Mount, Flue Outlet

25727

1

46

Weldment, Cabinet Top

69648

1

47

D-Ring Clip

83912

4

48

Bottom Intake

25722

1

49

Assembly, Cabinet Door

69649

1

50

Latch, Cabinet Door

891865

1

51

1800 CFM Blower Assembly

80590

1

N/S

1/4-20 x 3/4 Self Tapping Screw

83236

4

N/S

Washer

83045

4

52

Blower Motor

80588

1

53

Fan Center Assembly

69651

1

54

Honeywell Limit Control

80145

1

55

Harness, 3 Circuit Plug

80586

1

56

7/8” Snap Bushing-Heyco (BLK)

83909

3

57

Cable Chase

25732

1

58

Gasket, Access Panel

88155

1

59

Probe Access Panel

25733

1

60

Cover, Water Coil

25725

1

61

Bottom, Blower Box

25734

1

62

1-1/4” Bushing, Heyco

83910

1

63

Right Side, Blower Box

25737

1

64

Left Side Assy., Blower Box

69650

1

65

Back, Blower Box

25736

1

66

Top, Blower Box

25735

1

67

MTG. Bracket, Blower Box

25741

2

68

Motorized Natural Draft (MND) Assembly

69654

1

N/S

MND Motor

80592

1

69

3” Draw Band

23888

1

70

1/4-20 x 1” Hex Bolt

83379

2

71

1/4-20 Lock Nut

83261

2

72

Plate, Electrical Connection

25745

1

73

Strain Relief Bushing

80154

1

74

Hook, Handle

25748

1

75

Handle, Separable

891884

1

76

12” Stub Collar

89799

1

77

10” Stub Collar

891868

1

N/S

#10 x 3/4 Tek Screw w/ Bonded Neoprene 

Washer

83572

96

N/S = Not Shown

Summary of Contents for Clayton 1600EF

Page 1: ...ve com SAFETY NOTICE If this furnace is not properly installed a house fire may result For your safety follow these installation instructions Contact local building or fire officials about restrictions and installation requirements in your area This furnace must be installed by a qualified technician Keep these instructions for future reference Installation Operator s Manual Safety Tested to UL 39...

Page 2: ...lector Switch 10 HOT AIR OUTLET Limit Switch Access 55 5 8 5 3 16 17 5 16 43 7 16 29 3 16 14 1 4 6 31 5 8 29 1 2 2 9 16 45 3 4 65 1 2 24 1 4 6 FLUE GAS OUTLET HOT WATER COIL ACCESS OPTIONAL 12 COLD AIR RETURN D RINGS FOR GUY WIRE ATTACHMENT ...

Page 3: ...eason for Purchase qAlternative Heat qMain Heat Source qDecoration qCost qOther_________________________ What was the determining factor for purchasing your new USSC appliance _______ I have read the owner s manual that accompanies this unit and fully understand the Installation q Operation q and Maintenance q of my new USSC appliance Print Name Signature Date Please attach a copy of your purchase...

Page 4: ... CUT HERE CUT HERE Ê É Fold Here Fold Here United States Stove Company P O Box 151 South Pittsburg TN 37380 Fold Here PLACE STAMP HERE ...

Page 5: ...r dealer immediately Review the items in cluded with your furnace located inside the firebox 1 10 Starter Collar 1 12 Starter Collar for Cold Air Return 8 10 x 3 4 Screws w Sealing Washer 1 Literature Package This furnace may be installed as a Stand Alone Central Furnace or as a Supplementary Furnace If installed as a Central Furnace this unit will have it s own central ducting system and will ess...

Page 6: ... down to the rings located around the top of the furnace cabinet See illustration The above clearances to combustibles must be maintained Someimportantrulesforpreparinggoodfirewoodare Cut split and stack the wood in the early spring and let it stand in the sun and wind all summer Whether you purchase your wood or cut it yourself spring is the best time to buy or cut your wood to insure it is good ...

Page 7: ...isters The heat outlet should never be less than ten inches 10 round or 79 square inches This furnace must be installed with a cold air return system The system must be a minimum of twelve inches 12 to readily transfer the cold air from the home back to the furnace If desired a cold air filter box may be constructed with a minimum opening of 225 square inches The warm air supply outlet of the outd...

Page 8: ...isting duct work Connect the duct with a 45 degree elbow or at an angle so the hot air from the outdoor furnace is delivered downstream This will insure proper air flow into the system Avoid delivering hot air through an air conditioning coil as this will cause an obstruction reducing heat output The following illustrations may be used as examples for your installation INSTALLATION EXAMPLES TYPES ...

Page 9: ...inst the door frame on the furnace Feed Door Illustration Ash Door Illustration 1 Feed Door Latch 1 Ash Door Latch 4 1 4 20 x 3 4 Hex Bolt 4 1 4 20 Kep Nut BRACKET Insert the Shaker Rod into the hole on the ash door frame as shown Then attach the Shaker Bracket to the front of the furnace using two 1 4 20 x 3 4 Hex Bolts and two 1 4 20 Lock Nuts Next insert the shaker Rod into the bracket and atta...

Page 10: ...o put the snap in plug C back in place Re silicone all the seams with weather resistant silicone 3 To remove the Distribution Blower E Unplug from power supply Remove items B and D as described above Unplug the blow er from the top of the Fan Center G Remove the four 4 screws retaining the blower 4 To remove the Blower Motor Unplug from power supply Perform number 3 above Before removing the motor...

Page 11: ...used to replace the rivets If baffle replacement is necessary slide the baffle out until you can access the nuts thru the flue outlet Once the nuts have been removed slide the baffle off the rod and thru the opening in the firebrick You may have to remove one of the firebrick to make baffle removal easier There are 4 full brick and 1 half brick in the top of the fur nace Install the brick by inser...

Page 12: ...t ash through Do not agitate the fire bed too often This practice will waste coal If glowing coal is visible in the ash pan you have shaken to much 2 Remove all ashes every day from ash pit CAUTION Ashesshouldbeplacedinametalcontainerwith a tight fitting lid The closed container of ashes should be placed on a non combustible floor or on the ground well awayfromallcombustiblematerialspendingfinaldi...

Page 13: ...tely inspect system for damage before further use NEVERthrowwateronthefireoratthefurnace asrapidly expanding steam could result in a severe scalding Slow fires It is not recommended burning the Clayton furnace any more than necessary early in the fall and late spring as you cannot keep the firebox hot enough without overheating your home to burn gases Slow fires can cause excessive creosote build ...

Page 14: ... E Make sure you re not suffocating the fire with exces sive amounts of unburned wood F Slide baffle should be pulled out prior to load door opening 4 Problem Distribution blower vibrating Solution A Tighten blower wheel to motor shaft B Check for bad fan bearings 5 Problem Distribution blower continues to run or will not run Solution A Check fan limit or heat sensor and cable B Check to see that ...

Page 15: ...15 USSC WIRING DIAGRAM ...

Page 16: ...16 USSC PARTS DIAGRAM ...

Page 17: ...ont 25744 1 38 Assembly Cabinet Back 69647 1 39 Insulation Back 88153 1 40 Insulation Holder 83884 16 Key Description Part Qty 41 Inner Top 25726 1 42 Insulation Top Front 88150 1 43 Insulation Top Middle 88151 1 44 Insulation Top Rear 88152 1 45 Mount Flue Outlet 25727 1 46 Weldment Cabinet Top 69648 1 47 D Ring Clip 83912 4 48 Bottom Intake 25722 1 49 Assembly Cabinet Door 69649 1 50 Latch Cabin...

Page 18: ...1 2 Carriage Bolt 83503 1 4 Lock Nut 3 8 16 83274 1 5 Actuator Motorized Draft 80592 1 6 Tube Flipper 23899 1 7 Flipper 23898 1 8 8 x 1 2 Tek Screw Hex Head 83455 2 9 Strain Relief 80154 1 10 Power Supply Cord 80593 17 in 11 Male Tyco Terminal 80382 2 PARTS DIAGRAMS AND LISTS MOTORIZED DRAFT KIT 4 ...

Page 19: ...Box Body 25743 1 3 Switch 3 Position 80361 1 4 Harness 6 Circuit Receptacle 80583 1 5 Harness 3 Circuit Receptacle 80584 1 6 Harness 2 Circuit Receptacle 80585 1 7 Transformer Fan Center 80130 1 8 Strain Relief 80154 1 9 Power Supply Cord 80232 1 10 10 x 1 2 Sheet Metal Screw 83172Z 13 11 Washer Internal tooth 10 83240 1 ...

Page 20: ...20 USSC NOTES ...

Page 21: ...Remove the cover plate from the rear of the furnace firebox 4 Place one nut on each end of the water coil and thread each nut up to the end of the threads on the coil 5 Insert the coil through the holes from the inside of the firebox Install a gasket washer and nut onto each end of the water coil Tighten the nuts down securely to in sure an air tight seal The installation is now ready to be plumbe...

Page 22: ...e center of the firebox The first flames will be long and generally orange or yellow and produce quite a bit of smoke As the gases burn off the flames become shorter change color and produce less smoke Once the fire is WELL ESTABLISHED add coal to the center of the firebox forming the cone Burning in this fashion allows heat to drive off the volatile gases and turbulence created increases the burn...

Page 23: ...ew minutes until the volatile gases have burned off It is not necessary to shake down the ashes each time you refuel the furnace Experience will be your best teacher BANKING THE FIRE For extended operation such as overnight the fire will need to be banked To do so heap coal up along the sides and back of the firebox so that the fire gradually burns it over a longer period of time The intensity of ...

Page 24: ...e reference When placing an order or for warranty claims please provide the following information found on the Certification Plate located inside the cabinet door PART NUMBER PART DESCRIPTION MODEL NUMBER______________ SERIAL NUMBER______________ United States Stove Company 227 Industrial Park Road P O Box 151 South Pittsburg TN 37380 423 837 2100 Customer Service 800 750 2723 Repair Parts 888 299...

Reviews: