6
14
. After completing the assembly of the base bar fill the
concrete upto the foundation top surface.
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
13
. Place the entrance taper channel
(ECB)
on
top of the
(BBF)
. Secure with
(S2)
screws to the
foundation. See fig. 1 & 2.
S2
Fig.1
Fig.2
ECB
BBF
Step 1
Step 2
OPTION - 2