USC 6057-C Quick Start Manual Download Page 2

1.  Connect clean, dry, oil-free shop air to air 

inlet. Supply pressure should be set between 
60-120 psi.

2.  Set inlet pressure regulator on back of the 

welder to 

15 psi

3.  Adjust 

  ne 

 ow control on the air (le

 

  ) side 

so the 

  ow meter reads 

15 LPM

. You should 

feel air coming from the torch.

4.  Adjust hot air temperature control to Level 1 to 

prevent any current 

  ow to hea

 

  ng element.

5.  Plug in and turn on power strip. Turn hot air power 

switch on. Verify that the yellow light on the “air” 
side and the green “pressure safe” lights are glow-
ing.

6.  To turn on the nitrogen, back out the pressure screw 

on the nitrogen  tank regulator to prevent possible 
overpressure from damaging downstream  compo-
nents or the  tank regulator.

7.  Open nitrogen tank valve slowly. Check that the 

tank gauge needle shows some  pressure in  the 
tank. 

Page 2

8.  Turn pressure screw clockwise un

 

  l the outlet 

side gauge shows 

15 psi

.

Start-Up Procedure:

Reviews: