Initial Setup:
1. Unbox cart and remove accessories from box.
Find the hot air welder and airless welder
ps
and screw them into to the hea
ng elements.
4. Install nitrogen tank (argon or argon/CO2
may also be used). Install included safety
chains around tank. Adjust height of top tank
cradle if necessary.
5. Screw the nitrogen regulator into the tank.
Do NOT use te
fl
on tape. Tighten securely.
2. Install your shop’s quick disconnect plug into
the bo
om inlet port of the cart’s air mani-
fold.
Page 1
3. A short whip hose may be a
ached at the
front of the air manifold if desired to power
your die grinder and sander.
6057-C Nitro Fuzer Welding Cart Quick Start Guide