US Water Systems 169-ISF-1 Owner'S Manual Download Page 13

13  

 

8. 

Slowly place the by-pass in service position in 1/8 turn increments and let water flow 
into the mineral tank. When water flow stops, slowly open a cold water tap nearby 
and let run until the air is purged from the unit.  Once the air is purged and the  water 
is clear, fully open the bypass to the service position. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
9. 

Plug unit into an electrical outlet. Note: All electrical connections must be connected 
according to local codes. Be certain the outlet is uninterrupted. 

The Infusion tank should be installed with the inlet, outlet, and drain connections made in 
accordance with the manufacturer's recommendations, and to meet applicable plumbing 
codes.  The  Infusion system  is equipped with an SXT electronic controller.  The controller 
has three buttons; an “up” and  “down” arrows and a “extra cycle” button (diamond shaped 
arrow lines on the button). 
 

The Infusion Iron Filter must be initially regenerated to produce an air pocket for im-
mediate operation.  Please follow the procedure below to prepare the unit for ser-
vice. 

 
Press and hold the “extra cycle” button until the valve begins to move.  Let  the unit per-
form the entire regeneration.  The first cycle is the “backwash” (BW) cycle.  The next cycle 
to appear will be the “brine draw” (BD) cycle.  The next cycle to appear will be the  “rapid 
rinse” (RR) cycle.  The next cycle to appear will be the “brine fill” (BF).  Once this cycle is 
finished the valve will go back to the service position (time of day will appear and alternate 
to days between regenerations).  The unit is now flushed and ready for operation. 
 
Proceed to the programming section.  Be sure to review the timer features on the following 
page.   

Installation Instructions 

Start-Up Instructions 

Summary of Contents for 169-ISF-1

Page 1: ...ee Iron Manganese Sulfur Removal Owners Manual Models 169 ISF 1 169 ISF 2 169 ISF 3 169 ISF 4 REVISION 1 5 REVISION DATE June 13 2016 US Water Systems Corporate Office 1209 Country Club Road Indianapo...

Page 2: ...Where to Install the Softener 7 Softener Preparation 8 Installation Instructions 11 System Start up 17 Master Programming 19 Product Features 28 Regeneration Modes 29 Valve Dimensions 31 Assembly Draw...

Page 3: ...e distortion or oth er damage to non metallic parts Properly ground to conform with all govern ing codes and ordinances Use only lead free solder and flux for all sweat solder connections as required...

Page 4: ...stems com Give us a call at 1 800 608 8792 inFusion Iron Removal Systems Model Tank Size A B C 169 ISF 1 10 X 54 63 1 2 54 1 2 10 169 ISF 2 12 X 52 61 3 4 52 3 4 12 169 ISF 3 13 X 54 63 1 2 54 1 2 13...

Page 5: ...needed for the valve drain Continuous operation at flow rates greater than the service flow rate may affect capacity and efficiency performance The manufacturer reserves the right to make product impr...

Page 6: ...meter city water Place the conditioner as close as possible to a floor drain or other acceptable drain point laundry tub sump standpipe etc Connect the conditioner to the main water supply pipe BEFOR...

Page 7: ...7 System Overview...

Page 8: ...Pip ing that is built up heavily with lime and or iron should be replaced LOCATION OF INFUSION TANK AND DRAIN The inFusion tank should be located close to a drain to prevent air breaks and back flow C...

Page 9: ...uring the filling process It is recommended that a dust mask and safety goggles be worn to prevent possible injury Pour the CARBON in the tank SECOND Pour all the media sent with the system in the tan...

Page 10: ...tabs then turning the basket clockwise to lock it in place Place the upper basket over the distributor tube and push the valve on the tank Thread the valve on the tank by turning it clockwise Be sure...

Page 11: ...T PIPING TO MAINTAIN GROUNDING Any solder joints being soldered near the valve must be done before connecting any piping to the valve Always leave at least 6 152 mm between the control valve and joint...

Page 12: ...pipe size for residential drain line should be a minimum of 1 2 13 mm Backwash flow rates in excess of 7 gpm 26 Lpm or length in excess of 20 6 m require 3 4 19 mm drain line Commercial drain lines sh...

Page 13: ...three buttons an up and down arrows and a extra cycle button diamond shaped arrow lines on the button The Infusion Iron Filter must be initially regenerated to produce an air pocket for im mediate op...

Page 14: ...cycle button also initiates immediate or delayed regenerations Pushing and releasing it immediately triggers a delayed regeneration will regenerate at the time specified under RT in the programming m...

Page 15: ...arrows can be used to change this value Once the value is set press the extra cycle button to hold the setting and move to the next parameter 6 The next parameter to appear will be day override DO Th...

Page 16: ...time begins to change The PM 12 hour cycle is represented by a PM that shows up next to the minute dig it of the time If there is no PM next to the minute digit the unit is in the AM 12 hour cycle On...

Page 17: ...nd date of installation must be provided for any claims pertaining to equipment in warranty 5 Defective parts are subject to inspection by either US Water Systems Inc or any au thorized representative...

Page 18: ...stallation workmanship failure is not covered under warranty Damage caused by environmental conditions such as lightening strikes humidity or heat will not be covered under warranty These warranties a...

Reviews: