KHC-10 Installation Instructions – May 2020
www.uridanaustralia.com.au
Installation Instructions
CADET
KHC-10
ceramic | horizontal waste
Installation
1.
Measure the height from the center of the waste pipe and mark the holes for both special screws (No. 19). Drill holes and
mount screws.
2.
Install the 87° bend, keeping the distance of 100 mm from the wall to the middle of the pipe. The pipe connection is now
established.
3.
Adjust fitting No. (15), mark and drill holes and mount fitting No. (15).
4.
Hold the urinal against the wall und push firmly onto the fitting No. (19) ensuring the waste pipe connection is
maintained.
Please note
: There should be a gap of approx. 2 to 5 mm between the urinal and the wall, so tension cracks can be
prevented.
5.
Fill the waste trap (Position B) with water.
6.
Insert the stainless steel cover (Position A).
7.
Pour 1 bottle uriLOCK ( 0.3 liter) over the cover.
8.
Seal the gap between the wall and the urinal with silicone.
The uridan urinal is now ready for use!
Please leave customer care booklet, cleaning and maintenance instructions,
cleaning spray, cleaning cloth and suction device with customer.