background image

 

 

KHC-10 Installation Instructions – May 2020 

 

www.uridanaustralia.com.au

 

 

 

 

Installation Instructions

 

 
CADET

 KHC-10 

ceramic | horizontal waste 

 

Installation 
 

1.

 

Measure the height from the center of the waste pipe and mark the holes for both special screws (No. 19). Drill holes and 
mount screws. 

2.

 

Install the 87° bend, keeping the distance of 100 mm from the wall to the middle of the pipe. The pipe connection is now 
established.  

3.

 

Adjust fitting No. (15), mark and drill holes and mount fitting No. (15). 

4.

 

Hold the urinal against the wall und push firmly onto the fitting No. (19) ensuring the waste pipe connection is 
maintained. 

Please note

: There should be a gap of approx. 2 to 5 mm between the urinal and the wall, so tension cracks can be 

prevented.  

5.

 

Fill the waste trap (Position B) with water. 

6.

 

Insert the stainless steel cover (Position A). 

7.

 

Pour 1 bottle uriLOCK ( 0.3 liter) over the cover. 

8.

 

Seal the gap between the wall and the urinal with silicone.  
The uridan urinal is now ready for use! 
 

Please leave customer care booklet, cleaning and maintenance instructions,  

cleaning spray, cleaning cloth and suction device with customer. 

 

Reviews: