![UPT SkyHook II RSL Packing Instructions Download Page 8](http://html.mh-extra.com/html/upt/skyhook-ii-rsl/skyhook-ii-rsl_packing-instructions_1061368008.webp)
INSTRUCT-001 Rev 3
Page 8 of 12
10/10/2011
Setting the staging loop
7.
Begin by pulling the bridle line all the way to the top of the container as shown, and then fold it in half.
8.
Stow 1
”
(25mm) of folded bridle as shown and
tuck the excess slack under flap 1 as shown.
1”
k
çíÉ=
CHECK RESERVE RISER PLACEMENT
BEFORE CLOSING FLAP #2
• Ensure that the risers are at the edge of
the pack tray with the rear riser fanned to
the outside.
•Adjust the risers so that they lay flat against
the yoke or shoulder padding.