© UPLIFT Desk
• 800-349-3839 • [email protected] • upliftdesk.com
Step 1
Attach the Base to the Back by first fitting the Back into the slot
on the top of the Base.
Be sure that the grooves for the Support brackets on the Back
and the Base are on the same side and are adjacent to each
other.
From the bottom of Base, install three M6x16 machine screws
and three M6x20 washers. Be careful not to overtighten or strip
the screws.
Step 2
Fit the Support brackets into the grooves on the Base and Back
assembly, and attach using two M5x16 wood screws on each
bracket.
Be careful not to overtighten or strip the screws.
Step 3
Insert a Hanger Bar as shown into two of the recessed holes on
the front side of the Base and Back assembly and attach from
the back side using two M6x16 machine screws and two M6x20
washers. Make sure the screws are snug but be careful not to
overtighten or strip the screws.
Once secure, continue with the remaining Hanger bars and
hardware, working your way up.
Base
Back
Support bracket
(qty 2)
Hanger bar
(qty 6)
M6x16 machine screw
(qty 15)
M5x16 wood screw
(qty 4)
M6x20 washer
(qty 15)
Package Contents
Motion-X 6-Pack Rack
SKU: ACC052