P a g e
| 3
Electric Combination Boiler User Manual
During the installation phase of the boiler you need to install electrical installations according to the
recommended cable cross-sections. Cable sections and fuse amps are provided in the technical data sheet.
On the main cable coming out from under the boiler body (Yellow-Green) the ground line is left. Be sure to
connect the ground line.
The boiler is programmed to operate every 24 hours (Calcification, air etc.) even if the boiler is left in the
combi-off position as long as there is a power supply.
UNMAK Electric combi boilers are hot water boilers with high efficiency and are designed to work only with
electricity.
These devices are only used for heating of the heating system, not for use in direct water heating. The
domestic hot water will only be as much as the amount of equipment supplied in the appliance. The energy
required for domestic water will be taken from the energy of the device.
This product must be connected to the mains with the earth line and residual current relay!
Your user manual should be read carefully and stored with the associated warranty
certificate for the life of the device.
SHIPPING and TRANSPORTATION
UNMAK electric combi boilers are manufactured from thick sheet metal. The
devices are packaged in one piece. The device is delivered in a
carton box with mounting brackets and apparatus for hanging.
In the box with the device, fuse box, leakage current relay, 2 pieces
½”, non-asbestos gaskets for domestic water turns, 2 pieces ¾”, non-asbestos gaskets for installation,
3 pieces of 8 triple screws and dowels.
Safe transport of the product
Care should be taken when transporting the electrical boiler to the installation site. Therefore, it should
be transported by two people or by means of suitable means of transport.