FIRST START-UP 

 
In order to fill the heating system with water, it must be connected with a hose from the lowest code entry of the 
system. The vent must be left open for air to exit from the highest point of the system. This is not necessary in open 
expansion systems. The environment should be filled with water by opening the faucet, then it should be connected 
to the point where the water will be pumped. If the lowest code is in the radiator, while the system is flooding, if 
there is a manometer in the heating device, it should be observed with a manometer and the system should be 
brought to around 1-1.5 bar. 
 
Care should be taken not to leave any air in the system. 

 

MAINTENANCE AND CLEANING 

 

Regular checks: 

• It should be checked whether there is a water leak (leakage), and if there is a water leak, the installer should be 
contacted. 
• Radiators should only be cleaned with a lint-free cloth with warm water and no chemicals. 
 

Periodic checks: 

• By separating the sides of the panel radiators, the grids on them can be removed and the gaps between the 
convectors can be cleaned, or by blowing air from above with a hair dryer without removing the grille, the dust 
can be poured from below. 
• While the system is running, the radiator surfaces should be checked manually from bottom to top to see if there 
is a cold zone. Being a cold zone indicates that there is air remaining in the radiator.Sezonluk kontroller: 
 
• Radiator convector cleaning can be done by professional cleaning companies. 
 
 

RADIATOR BLEEDING 

 

It is taken from the places shown in the figure, the air vents. A deep container should be found and precautions 
should be taken for the dirty water to come out. The system 
should be started and the pressure should be increased up 
to 2 bar. With the air vent wrench or flat screwdriver, the 
screw on the air vent should be turned counter clockwise 
slowly. If air is trapped in the system, it will come out at this 
time. When the water starts to flow properly, its air will be 
taken. Then the pressure of the system should be checked 
and brought to around 1-1.5 bar. 

Summary of Contents for 10 P

Page 1: ...ator User Manual Panel Radiator Use and Maintenance Manual NL SOY Yap Malzemeleri Sanayi ve Ticaret Ltd ti Pancar Organize Sanayi B lgesi 2 Etap No 2 Torbal ZM R TURKEY Tel 90 444 35 32 Fax 90 232 469...

Page 2: ...P a g e 1 NMAK Radiator User Manual...

Page 3: ...D OF TRANSPORTING and HANDLING 3 SELECTION OF INSTALLATION SITE 3 FEATURES OF RADIATORS 5 INSTALLATION DIAGRAM 7 FIRST START UP 8 MAINTENANCE AND CLEANING 8 RADIATOR BLEEDING 8 INFORMATION ON USAGE ER...

Page 4: ...n transporting them to the place where they will be installed Equipment to be used to lift and transport the product must be of sufficient capacity When removing the package of the radiator hard and s...

Page 5: ...ators should not be drained Emptying the radiators at the end of the season requires a new water filling while filling them with new water which will mean an increase in oxidation in the radiator If t...

Page 6: ...in accordance with DIN 55900 standards The radiators which are primed and fired with the dip wet paint method are painted with robot guns in RAL 9016 color and baked with the electrostatic powder coa...

Page 7: ...d fired with the dip wet paint method are painted with the electrostatic powder coating method with robot guns and then fired Mounting materials suspension apparatus breather plug blind plug console h...

Page 8: ...15 3 84 384 330 253 218 600 800 556 17 4 35 436 375 288 248 600 1000 556 20 5 21 524 451 346 297 600 1100 556 23 5 87 594 511 392 337 600 1200 556 25 6 39 645 555 426 366 600 1400 556 28 7 25 734 631...

Page 9: ...no chemicals Periodic checks By separating the sides of the panel radiators the grids on them can be removed and the gaps between the convectors can be cleaned or by blowing air from above with a hai...

Page 10: ...replaces the warranty document 7 In case of failure the time spent in repair is added to the warranty period 8 The maximum repair time is 20 days This period starts from the date of notification to th...

Page 11: ...aret Limited irketi Address Pancar Organize Sanayi B lgesi 2 Etap No 2 Torbal ZM R TURKEY Tel Fax 90 444 3532 90232 469 2412 Authorized person signature stamp Seller Title Address Invoice Date Number...

Page 12: ...ument No 37278 This warranty document was made in accordance with the Law No 6502 and the Regulation on the Principles of Guarantee Certificate issued based on this Law The use of this warranty docume...

Reviews: