background image

5. 

To determine the Length L, a

dd the square of “Y” 

( Y * Y)

 

and the square of “X”          

( X * X )

 and take the square root of the sum. 

 

 
 

6.  The threaded rod will screw into the poppet cam to a depth 

of ¼”. Add ¼” to the length L previously calculated to 
determine the total length for cut.  

 

7. 

Apply thread sealant to ¼” at the end of the rod to be screw 
onto the poppet cam. Screw on the float rod into the poppet 
cam ¼”. Do not over thread. When installed properly the 
float rod should swing back and forth freely. 

 

8.  Apply pipe dope to NPT thread and install the valve with the float 

hanging in the vertical position. 

 

9.  Note: There is a marked line on the valve as shown in Fig 6 to 

indication the direction of swing for the float. Be sure to install so 
that there is no obstruction to the swing of the float. The float will 
swing to the right or left of the marked line for shut off.  

 
 

 
 
 

 
 
 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

Figure 5 Length 
of Rod to be Cut 

Figure 6 Marked 
Line showing 
Direction of 
Float 

Reviews: