OM-202 515 Page 15
4-5. Connecting Work Clamp And Gas/Air Supply
Ref. 803 640-A / 802 803-A
1
Work Clamp
2
Workpiece
Connect work clamp to a clean,
paint-free location on workpiece, as
close to cutting area as possible.
.
Use only clean, dry air with 90
to 150 psi pressure.
3
Gas/Air Inlet Opening
4
Hose
5
Teflon Tape
Obtain hose with 3/8 in (9.5 mm) or
larger diameter and 1/4 NPT right-
hand thread fitting. Wrap threads
with teflon tape (optional) or apply
pipe sealant, and install fitting in
opening. Route hose to gas/air
supply.
Adjust gas/air pressure according
to Section 5-2.
Tools Needed:
5/8, 1-1/8 in
From Gas/Air Supply
3
4
Rear of
Unit
5
1
2
4-6. Electrical Service Guide
Max Recommended Standard Fuse Rating In Amperes
Input Voltage
Input Amperes At Rated Cutting Capacity
Circuit Breaker
1
, Time-Delay
2
Normal Operating
3
UPC 838
380
440
21.6
19.3
30
30
35
35
4
6
10
50
100
150
Min Input/Grounding Conductor Size In mm
2
Max Recommended Input Conductor Length In Meters
Reference: 1999 National Electrical Code (NEC)
1 Choose a circuit breaker with time-current curves comparable to a Time Delay Fuse.
2 “Time-Delay” fuses are UL class “RK5” .
3 “Normal Operating” (general purpose
−
no intentional delay) fuses are UL class “K5” (up to and including 60 amp), and UL class “H”
( 65 amp and above).
Summary of Contents for UPC 838
Page 2: ......
Page 27: ...OM 202 515 Page 23 Notes...
Page 28: ...OM 202 515 Page 24 SECTION 7 ELECTRICAL DIAGRAM Figure 6 1 Circuit Diagram For Power Source...
Page 29: ...OM 202 515 Page 25 202 521...
Page 34: ...Notes...
Page 35: ...Notes...