10
•DRAWINGS FOR ILLUSTRATION PURPOSES ONLY•
ASSEMBLY OF FURNACE
Your furnace requires the following items
to be assembled or installed by the service
person:
Feed Door Handle
Feed Door Latch
Ash Door Handle
Ash Door Latch
Blower and Blower Control
Electrical Connections
Remove all parts from inside the
furnace and inspect for damage,
including the firebrick as some
breakage could occur during
shipment.
Assemble the feed door handle and
the ash door handle as shown in
Figure 8.
Install the latches as shown in Figure
9.
1.
2.
3.
FIG. 8
FIG. 9
Summary of Contents for HOTBLAST 1200G
Page 6: ...6 DRAWINGS FOR ILLUSTRATION PURPOSES ONLY MODEL 1200G DIMENSIONS FIG 1...
Page 19: ...19 DRAWINGS FOR ILLUSTRATION PURPOSES ONLY MODEL 1200G PARTS...
Page 25: ...25 DRAWINGS FOR ILLUSTRATION PURPOSES ONLY APPENDIX INSTALLATION F INSTALLATION G...
Page 26: ...26 DRAWINGS FOR ILLUSTRATION PURPOSES ONLY NOTES...