background image

7. Under "Changes After Conversion", write in the following;

a. Kit number, 1LN0802.

b. Unit model number.

c. Stamp or write in the name of the organization, address,

city, state, month and year.

8. Remove label backing and affix label adjacent to the Rating

plate.

9. Follow start-up procedure in the Installation Instruction.

REMOVAL FOR CLEANING

WARNING: Cleaning of the heat exchanger must be done by

an accredited UPG distributor, dealer or service
agency.

1. Disconnect power supply.

2. Shut-off gas valve and shut-off gas supply upstream of gas

valve.

3. Remove gas piping at union and remove gas piping to gas

valve.

4. Remove the burner assembly (see Step 1 under "Installa-

tion).

5. Remove the screen and store being careful not to step on

or otherwise damage the parts.

6. Refer to the cleaning instructions in the furnace Installation

Instructions.

7. Reinstall the screens in the heat exchanger by the following

Step 3 and 4 under installation.

Subject to change without notice.  Printed in U.S.A.
Copyright

 

 by Unitary Products Group 1996. All rights reserved.

530.46-N1.14V

745 Industrial
Parkway
West

Elyria
OH
44035

Unitary
Products
Group

Reviews: