7.

 

Glue the 

arch

 and connect the 

flue

 to the flue fitting (Pic.7). 

 

Pic
.7

 

 

8.

 

Build the 

walls

 to close the oven. Should the oven have a protection roof, at 

least two ventilation grids will be necessary at the sides (

e.g. 10x10 cm

). 

Pour the contents of the 

grained vermiculite

 bag, supplied in the kit, in order 

to fill the empty spaces between the oven and external walls. 

 

Pic
.8

 

 

9.

 

If the oven is exposed to bad weather, it is advisable to make a 

protective 

roof

 

Pic
.9

 

 

 

 

 

Starting the oven 

 

 

Once assembly is complete, you can start up the oven. 

First day

Using small pieces of wood, light a small fire in the center of the oven, taking care that the flame does not 
touch the vault, and keep it going throughout the day. 
At the end of the day, let the fire go out with the door closed. 

Second, third and fourth day

Repeat the same operations as per day one. 

Fifth day

Light and constantly feed the fire, so as to gradually increase the temperature throughout the day, until 
the required temperature is reached. 

 

 

Please notice 

 

 

Any surface cracks due to thermal expansion do not jeopardize the functioning of the oven. 

 

 