Pro Line
Assembly instructions
Rev. 01 - 13/08/2020
Pag. 2 / 2
www.unistara.com
7.
Glue the
arch
and connect the
flue
to the flue fitting (Pic.7).
Pic
.7
8.
Build the
walls
to close the oven. Should the oven have a protection roof, at
least two ventilation grids will be necessary at the sides (
e.g. 10x10 cm
).
Pour the contents of the
grained vermiculite
bag, supplied in the kit, in order
to fill the empty spaces between the oven and external walls.
Pic
.8
9.
If the oven is exposed to bad weather, it is advisable to make a
protective
roof
.
Pic
.9
Starting the oven
Once assembly is complete, you can start up the oven.
First day
:
Using small pieces of wood, light a small fire in the center of the oven, taking care that the flame does not
touch the vault, and keep it going throughout the day.
At the end of the day, let the fire go out with the door closed.
Second, third and fourth day
:
Repeat the same operations as per day one.
Fifth day
:
Light and constantly feed the fire, so as to gradually increase the temperature throughout the day, until
the required temperature is reached.
Please notice
Any surface cracks due to thermal expansion do not jeopardize the functioning of the oven.