Star Crusaders 2 Prototype Manual
07/09/2022
12
Step 4 Install POP board to the back of the LOGO marquee. Utilize screws to secure.
Step 5 Align the Control panel with the cabinet. Connect the connectors.
Name
POP board
Qty
1
Name
Cross recessed
hexagon bolt set
Spec.
M6×20
Qty
4
POP board
Cabinet
Control panel