Lane Master Pro GMP Manual
02/27/2020
12
4.4.2 Connect Lane Assembly & Display Assembly
Step 1
Use the Allen hexagon wrench (Provided) to lock the back box with the lanes as
indicated.
Step 2
Lower leg levelers into place for initial leveling of the back box and the lanes if the
floor is uneven.
Step 3
Add ball to each lane and apply power.
Step 4
Once game is powered on and operational place it in position. Utilizing the leg
levelers to assure the back box and lanes are level with each other.
Lock
Unlock