~ 8 ~
4. Install the screw on the control unit case cover.
5. Lift the walk through metal detector to the vertical position and move to the
assigned position.
6. Plug power cable
【
CONTROL PANEL
】
There are six buttons on the operation panel.
1. LEFT: Turn left
2. RIGHT: Turn right