Sageon III Power System
Distribution Option Kit Installation
PM990-8800-00, Rev. 9
7-5
Installing the kit
While installing the kit, refer to Figure 7-5 and to a factory-installed group for location and orientation of items included in the kit.
Gr
o
up
B
Gr
o
up
A
-48V or +24 Vdc
Bus Bar
Item A - Screw, #10, Qty 2
Item B - Screw, 12 x 24 x 3/4, Qty 2
Press-in Nut
In Underside of
Bus Bar, Qty 4
Distribution
Assembly
5/16 Bolt, Flat Washer, and
Bevel Washer, Qty 4 Each
5/16 Flat Washer, Bevel
Washer, and Nut, Qty 2 Each
Gr
o
up
A
Gr
o
up
B
Distribution Assembly
Support Bracket
Item A
Item B
Rack Rail
With
Threaded
Holes
FIGURE 7-5 TYPICAL INSTALLATION OF AM1 DISTRIBUTION
1.
Open the kit. The packing list will identify the kit by part number and name.
2.
Open the distribution area door. Refer to Figure 7-1 and locate the Group where the additional distribution is to be installed.
3.
From the kit, collect the U-shaped bus bar and four each: 5/16-18x¾” bolts, 5/16” bevel washers, and 5/16” flat washers.
4.
In the selected group, position the four unthreaded holes of the U-shaped bus bar from the kit onto the factory installed U-
shaped bus bar of the distribution option directly below the your selected group. Orientation will be the same as the
installed bus bar; see Figure 7-4. Using the hardware collected in step 3 above, bolt the bus bar from the kit to the factory
installed bus bar.
5.
From the kit, collect the distribution assembly support bracket, two 12-24x¾” screws.
6.
Orient the support bracket as shown in Figure 7-5, so the bracket legs with the two rectangular holes is against the closest
vertical rail of the rack. Use the two 12-24x¾” screws to fasten the bracket to the rack rail.
7.
From the kit, collect the distribution assembly and two each: 10-32 hex-head screws, 5/16” flat washers, 5/16” bevel
washers and 5/16x18 hex nuts.
8.
Referring to Figures 7-4 and 7-5 for assembly orientation, insert the studs of the distribution assembly into the U-shaped
bus bar and fasten with the flat washers, bevel washers and nuts. The 10 pairs of output studs on the distribution assembly
should be oriented towards the vertical rail of the rack.
9.
Fasten the support bracket to the distribution assembly using the two 10-32 hex-head screws.