Commissioning
User Manual CWD2005 Plus
13
6. Commissioning
The compressed air supply is connected via the connector on the right side of the analyzer.
A flexible hose is with nominal diameter of 1/2 " is required.
A filter cartridge dryer unit must be installed. Pay attention: the maximum input pressure at
the analyzer is 0.3 bar (4.351 psi).
Before switching on, the analyzer must be rinsed at least half an hour using compressed air.
After that, the analyzer can now be switched on.
The analyzer ignites automatically and opens the solenoid valves.
Fig. 1