![Union Instruments INCA5021 Translation Of The Original Operating Instructions Download Page 25](http://html.mh-extra.com/html/union-instruments/inca5021/inca5021_translation-of-the-original-operating-instructions_843050025.webp)
Transport, setup and acceptance
25
Electrical Connections
Fig. 5.3:
Electrical connections
1. Relay X10
2. Profibus
3. Relay for ball valves X13
Depending on the type and equipment used, these are attached to the top hat rail.
NOTE
Current assignment depends on the configuration, see attached wiring diagram.
3
2
1
Summary of Contents for INCA5021
Page 3: ...3 Dimensions ...
Page 10: ...EU Declaration of Conformity 10 ...
Page 30: ...Transport setup and acceptance 30 ...
Page 32: ...Startup switching on 32 ...
Page 46: ...Operation 46 ...
Page 48: ...Decommissioning switching off 48 ...
Page 52: ...Maintenance 52 ...
Page 56: ...Service 56 ...
Page 58: ...Associated documents 58 ...
Page 60: ...Disposal 60 ...
Page 62: ...Spare parts 62 ...
Page 63: ...63 16 Annex ...
Page 64: ...Annex 64 EU Declaration of Conformity Flame arrester ...
Page 65: ...Annex 65 ...