
10
| Viper Cut 30 Manual
1.
Connect the earth lead to the work piece.
2.
Connect the air supply to the regulator located at the rear of the machine. Set Air Pressure to 0.5MPA (75psi)
3.
Turn on the air supply. Set air supply to 5-6 Bar / 170 lpm.
1.
Connect the earth lead to the work piece.
2.
Connect the air supply to the regulator
located at the rear of the machine. Set Air
Pressure to 0.5MPA (75psi)
SET UP PROCEDURE FOR
PLASMA CUTTING
Summary of Contents for Viper Cut 30
Page 21: ...Viper Cut 30 Manual 21 NOTES...
Page 22: ...22 Viper Cut 30 Manual NOTES...
Page 23: ...Viper Cut 30 Manual 23 NOTES...