Figure 1-4A

Platform Control Station

Operation - Page 1 - 4A

CONTROLS (S/N: 2235 & Above)

The movement of the lift may be controlled from the Platform Control Station (bucket) or the Lower Control Station (base).

Platform Control Station

The Platform Control Station is located at the upper end of the telescoping boom (see Figure 1-4A) and contains five toggle
switches and a power indicator lamp.  The Platform Control Station is used to control movement of the machine from the
bucket.

The Platform Control Station has five control toggle switches:
an EMERGENCY STOP switch, a DOWN OVERRIDE-OFF-
ENABLE  switch,  and  three  control  switches.  The
EMERGENCY STOP switch applies or removes power to the
Platform  Control  Station,  and  must  be  in  the  ENABLE
position to operate the machine from the bucket.  The DOWN
OVERRIDE-OFF-ENABLE switch applies or removes power
to  the  control  switches.    Activating  a  switch  in  a  certain
direction results in a corresponding movement of the bucket. 
The switch actuators are spring loaded to the neutral position.

To operate the machine from the Platform Control Station:

M

  Set the EMERGENCY STOP switch to the “ENABLE”

position.  The power indicator lamp will light.

M

  Hold the DOWN OVERRIDE-OFF-ENABLE switch to

the “ENABLE” position.

M

  Activate a control switch in the chosen direction to move

the bucket/boom in the corresponding direction.

M

  When the control switch is released, the actuator returns

to the neutral position, and  movement stops.

M

  Movement will also stop when the DOWN OVERRIDE-

OFF-ENABLE switch is released.

The DOWN OVERRIDE position serves as a means of lowering and retracting the boom in an emergency situation due to
an electrical system malfunction or interlock concern.  Activating the switch to the DOWN OVERRIDE position allows
operation of the LOWER and RETRACT functions only.

Lower Control Station

The lift may also be operated from the base (see Figure 1-5A).  The Lower Control Station contains four toggle switches,
a key switch, and an EMERGENCY STOP button.

The EMERGENCY STOP button must be pulled out and the PLATFORM CONTROL-LOWER CONTROL switch must
be held in the LOWER CONTROL position before the control switches at the base will operate.  This prevents accidental
activation of the Lower Control Station.

IMPORTANT: The Lower Control Station is intended for crane operation and stowing of the booms.  When a worker
is present in the bucket, the base controls may be used for an emergency only!

The toggle switches control movement of the booms and rotation system.  Activating a switch in a certain direction results
in a corresponding movement of the bucket.  The switch actuators are spring loaded to the neutral position.

The rotation system is equipped with two limit switches that prevent more then 350

E

of rotation.  When the boom is rotated,

and a limit switch is reached,  rotation will stop.  Simply reverse the control and rotate in the opposite direction to reposition
the bucket.

Courtesy of Crane.Market 

Summary of Contents for 538

Page 1: ...Universal Crane and Personnel Lif t OPERATOR S MANUAL Publication No 4500360 1 0410 A PRODUCT OF Champ UniLift 850 State Hwy 55 Brooten MN 56316 www ChampUniLift com Courtesy of Crane Market ...

Page 2: ...rstand the use of the Emergency Manual Lowering Valve and other emergency procedures I will not attempt to alter or disable any safety devices guards or interlocks I have been shown the location of the Operators Manual and was instructed to read the manual prior to operation I understand that the 538 UniLift is NOT INSULATED and shall not be used within 10 feet of any power lines I will wear the b...

Page 3: ... electrical power cords are safely stored to prevent tangling or crushing 6 Always wear the proper body harness and keep the harness secured to the lanyard ring whenever operating the 538 UniLift from the bucket 7 DO NOT exceed the manufacturer s rated lifting capacities 8 The lower controls are for emergency use only when a worker is present in the bucket 9 It is PROHIBITED and DANGEROUS to use r...

Page 4: ...E START INSPECTION 1 5 BUCKET LOCK 1 5 BUCKET OPERATION 1 5 CRANE OPERATION 1 6 SHUTDOWN 1 6 SYSTEM RECHARGING 1 7 EMERGENCY CONTROLS 1 7 Power ENABLE Switches 1 7 Station Override Switches 1 7 Emergency Stop Switches 1 7 EMERGENCY MANUAL LOWERING VALUE 1 7 EMERGENCY PROCEDURES 2 1 PLATFORM CONTROL STATION SWITCH FAILURE 2 1 LOWER CONTROL STATION SWITCH FAILURE 2 1 HYDRAULIC LINE FAILURE 2 1 POWER...

Page 5: ...THIS PAGE LEFT INTENTIONALLY BLANK Courtesy of Crane Market ...

Page 6: ...lowing basic components Figure i 1 UniLift With Personnel Bucket Attached ADJUSTABLE OUTRIGGERS Outriggers are used for absorption of tipping load during use and are manually set Adjustable for up to three feet the outriggers assure that the unit can be leveled and rest firmly on solid footing Electrical interlocks prevent lift crane operation until all four outriggers are fully extended and resti...

Page 7: ...details on battery system HYDRAULIC LIFT AND TELESCOPING CYLINDERS Aerial lift is provided by a 3 single acting cylinder attached to the upper and lower booms Telescoping lift is provided by a 1 1 2 double acting cylinder located inside the upper boom telescoping boom assembly The telescoping boom will extend up to 9 feet allowing a side reach of approximately 24 feet Hydraulic power is provided b...

Page 8: ...WITH ELECTRICAL WIRES Description Page i 3 UNIVERSAL CRANE Two 2 anchor points are provided for lifting loads up to 500 pounds with the personnel bucket removed The inner lanyard ring has a 500 pound load rating with the boom fully retracted The outer lanyard ring has a 300 pound crane load rating in any position See Figure i 2 Note The 500 pound load rating is ONLY during crane operation and ONLY...

Page 9: ...THIS PAGE LEFT INTENTIONALLY BLANK Courtesy of Crane Market ...

Page 10: ...mum Operating Pressure 1350 PSI 9 31 MPa At point where boom hook is 8 feet from center of rotation 500 lb 227 kg rating at full retraction only inner arc Figure i 2 Should be 1100 PSI 7 6 MPa on 534 Models Unit with Jack Type outriggers MINIMUM VEHICLE TIPPING LOAD HORIZONTALLY EXTENDED On level ground 1 1 2 x rated load 450 lbs 204 kg On 5E slope 1 1 3 x rated load 400 lbs 182 kg BUCKET TRAVEL B...

Page 11: ...THIS PAGE LEFT INTENTIONALLY BLANK Courtesy of Crane Market ...

Page 12: ...lbs Always connect the lights and safety chains and use safe towing practices The boom must be stored in the boom cradle when the trailer is in motion A tie down strap is provided for travel and will prevent excessive wear due to vibration and oscillation Also the bucket should be hinged up and locked into position For maximum safety limit the towing speed to 45 MPH or less PARKING Park the traile...

Page 13: ...les on one outrigger then proceed to the next outrigger DO NOT OVER EXTEND ANY ONE OUTRIGGER OUTRIGGERS MUST BE LOWERED EVENLY AND IN SEQUENCE The unit must be level with the weight of the unit supported by all 4 outriggers Note When outriggers are set on a slope 5 maximum the outriggers on the downhill side will be extended further than those on the uphill side in order to level the lift 5 Contin...

Page 14: ...ey are fully re engaged 4 Press the power jack switch UP until the front of the UniLift is above level This can be determined by watching the position of the tongue On the front outriggers disengage pin A and slide the horizontal outrigger out until it locks Grasp the front vertical outriggers disengage pin B and lower to the ground Disengage pin B lift up the horizontal outrigger until there are ...

Page 15: ...4500360 1 1106 Page 1 2B Operation Power jack instructions Courtesy of Crane Market ...

Page 16: ...Courtesy of Crane Market ...

Page 17: ...THIS PAGE LEFT INTENTIONALLY BLANK Courtesy of Crane Market ...

Page 18: ...e outrigger foot Crank all 4 outriggers evenly Raise the unit 2 3 holes on one outrigger then proceed to the next outrigger DO NOT OVER EXTEND ANY ONE OUTRIGGER OUTRIGGERS MUST BE LOWERED EVENLY AND IN SEQUENCE The unit must be level with the weight of the unit supported by all 4 outriggers Note When outriggers are set on a slope 5 maximum the outriggers on the downhill side will be extended furth...

Page 19: ... control switches at the pedestal see Figure 1 5 The UPPER CONTROL LOWER CONTROL Switch handle must be held in the LOWER CONTROL position before the directional control switches are operable The switch marked UP and DOWN controls the up and down movement of the boom The switch marked OUT and IN controls the action of the upper telescoping section of the boom The switch marked CCW and CW controls t...

Page 20: ...ol switch is released the actuator returns to the neutral position and movement stops M Movement will also stop when the DOWN OVERRIDE OFF ENABLE switch is released The DOWN OVERRIDE position serves as a means of lowering and retracting the boom in an emergency situation due to an electrical system malfunction or interlock concern Activating the switch to the DOWN OVERRIDE position allows operatio...

Page 21: ... any boom function The LOWER function also does not require pump activation so it may be used in conjunction with the RETRACT and ROTATION controls as would be used in returning the boom to the stowed position from a working position To operate the machine from the Lower Control Station M Make sure the EMERGENCY STOP button is pulled out M Hold the PLATFORM LOWER CONTROL switch in the LOWER CONTRO...

Page 22: ... and turn the key switch ON The green light on the Lower Control Station will be lit Raise the boom out of the boom rest and rotate away from the tongue using the lower controls Check to make sure that the bucket is properly installed Check the bucket yoke lock pins to insure it is positioned in the hole and the bucket yoke is securely locked to the boom IMPORTANT A body harness with a 4 ft lanyar...

Page 23: ...boom and move it clear of the work area Loads of 500 pounds maximum can be lifted by the inner lanyard ring with the telescoping boom fully retracted Do not extend the boom when lifting over 300 lbs Loads of 300 pounds maximum can be lifted to approximately 31 feet high with a side reach of approximately 22 feet by using the outer lanyard ring See Figure i 2 Proper sequence of operation to lift ob...

Page 24: ...ed or the Emergency Stop switch on the Platform Control Station controls is activated depress the override switch to LOWER CONTROL This will give the lower control station priority over the system Emergency Stop Switches Emergency Stop switches are located at both the Platform Control Station and the Lower Control Station See Figures 1 4 1 5 To shut off power to the system either Emergency Stop sw...

Page 25: ...red function The red EMERGENCY STOP pushbutton must be twisted clockwise to reset and resume normal operation HYDRAULIC LINE FAILURE If partial failure is experienced and holding valves do not lock use the controls in short intervals to store the booms Should a complete line failure occur the holding valve will lock The failed line must be repaired to release the holding valve POWER FAILURE Standb...

Page 26: ...ructions 1 Connect positive cable to positive post of discharged batteries 2 Connect other end of booster cable to positive post of booster battery 3 Connect second cable to negative post on booster battery 4 Make final connection on unit frame away from battery to prevent sparking 5 Remove cables in reverse order of installation Powered by TCPDF www tcpdf org Courtesy of Crane Market ...

Reviews: