12
For details of communication
protocol please refer to IEC/EN
61851-1 and the documentation
of the manufacturer of the
charging station.
Important note: In the case of
wrong wiring of the charging
station, low signal CP test
terminals can get high, live
hazard voltage.
CP Error
“E”
simulation
“E”
- CP Error simulation could be
realized by pushing the slider
switch into (spring loaded)
position [E]. This will simulate
behavior of the station when
there is a short circuit between CP
and PE through internal diode
(acc. to standard IEC/EN 61851-
1). In the case of CP Error
(“E”
is
pushed),
result
should
be
aborting of the charging process
and new charging process is
prevented.
Measuring terminals
All terminals inside the Type-2
connector (L1, L2, L3, N, PE, CP
and PP) are available on 4 mm
safety connectors with double
insulated wires according to IEC
61010-031. It is allowed to use
these for measuring purposes
only. It is not allowed to draw cur-
rent over a longer period or
supply
anything
else.
An
appropriate
measurement
instrument is needed.
Cleaning
If the instrument is dirty after daily
usage, it is advised to clean it by
using a humid cloth and a mild
household detergent. Prior to
cleaning, ensure that instrument is
switched off and disconnected
from external voltage supply and
Summary of Contents for EVSE X7
Page 1: ...EVSE X7 Adapter EV Charger Tester ...
Page 2: ... ...