PART IV: MAINTENANCE
35
8
replace the cable
CE
and re-assemble the burner following the procedure in the reversed order.
9
If a maintenance operation must be performed on the combustion heads, once the maniflod
CO
has been removed, proceed as fol-
lows:
10 unscrew the eight screws
VA
that secure the air box
CA
;
11 opne the air box
CA
;
remove the combustion head ass.y as shown on the next picture;
ATTENTION:
do not remove the the burner flange securing screws
VB
!
12 replace the cables, if damaged observing the numbering of the combustion head shown by the letters attached to the electrodes
cable;
13 to remove the electrodes, loosen the fixing screws
VE
;
14 remove the electrodes
E
from their supports if broken;
15 to remove the combustion head
T
remove first the fixing screws
VT
;
CE
CA
VA
VB
VE
E
Summary of Contents for R91
Page 16: ...PART II INSTALLATION 16 Fig 5 H a 0 50 mm...
Page 46: ......
Page 47: ......
Page 49: ...Service manual AZL2x LMV2x 3x Burner Management System M12916CD Rev 3 4 03 2023...
Page 56: ...8 Parameters level heating engineer...
Page 98: ...50 ERROR CODE TABLE...
Page 99: ...51...
Page 100: ...52...
Page 101: ...53...
Page 102: ...54...
Page 103: ...55...
Page 104: ...56...
Page 105: ...57...
Page 106: ...58...
Page 107: ...59...
Page 108: ...60...
Page 109: ...61...
Page 110: ...62...
Page 111: ...63...
Page 112: ...64...
Page 117: ......
Page 118: ......
Page 119: ......