PART II: INSTALLATION
20
GAS TRAIN CONNECTIONS
The diagrams show the components of the gas trai included in the delivery and which must be fitted by the installer.The diagrams are in
compliance with the current laws.
Key
GAS TRAIN CONNECTIONS
The diagrams show the components of the gas trai included in the delivery and which must be fit-
ted by the installer.The diagrams are in compliance with the current laws.
Procedure to install the double gas valve unit:
- two (2) gas flanges are required; they may be threaded or not depending on size;
- first step: install the flanges to prevent the entry of foreign bodies in the gas line;
- on the gas pipe, clean the already assembled parts and then install the valve unit;
- check gas flow direction: it must follow the arrow on the valve body;
- VGD20: make sure the O-rings are correctly positioned between the flanges and the valve;
- VGD40 and MBE: make sure the gaskets are correctly positioned between the flanges;
- fasten all the components with screws, according to the following diagrams;
- make sure bolts on the flanges are properly tightened;
и
MBEGas train with valves group VGD and MBE with built-in gas pressure go gas leakage pressure switch (PGCP)
1
Filter
6
Butterfly valve
2
Pressure switch - PGMIN
8
Main burner
3
Safety valve with built in gas governor
9
Bellows unit(*optional)
4
Proving system pressure switch - PGCP
10
Manual valve(*optional)
5
Pressure switch PGMAX:included MBE, for VGD e MB-DLE Optional
WARNING: before executing the connections to the gas pipe network, be sure that the manual cutoff valves are
closed.
ATTENTION: it is recommended to mount filter and gas valves to avoid that extraneous material drops inside the
valves, during maintenance and cleaning operation of the filters (both the filters outside the valves group and the
ones built-in the gas valves).
ATTENTION: once the gas train is mounted according to the diagram on Fig. 1, the gas proving test mus be per-
formed, according to the procedure set by the laws in force.
GAS INLET
SUPPLIED BY BURNER
CONSTRUCTOR
BY OTHERS
Summary of Contents for HRX92R-FGR
Page 46: ...PART III OPERATION 46 Fig 25...
Page 47: ...PART III OPERATION 47...
Page 61: ...Service manual AZL2x LMV2x 3x Burner Management System M12916CD Rev 3 4 03 2023...
Page 68: ...8 Parameters level heating engineer...
Page 110: ...50 ERROR CODE TABLE...
Page 111: ...51...
Page 112: ...52...
Page 113: ...53...
Page 114: ...54...
Page 115: ...55...
Page 116: ...56...
Page 117: ...57...
Page 118: ...58...
Page 119: ...59...
Page 120: ...60...
Page 121: ...61...
Page 122: ...62...
Page 123: ...63...
Page 124: ...64...
Page 129: ......
Page 130: ......
Page 131: ......