PART II: INSTALLATION
16
spacer to move the burner backwards or to design a blast tube tha suites the utilisation (please, contact the manifacturer).
Fig. 6
Key
a) Heat output in kW
b) Lenght of the flame tube in meters
c) Flame tube firing intensity in MW/m
3
d) Combustion chamber diameter (m)
Fig. 6 - Firing intensity, diameter and lenght of the test flame tube as a function of the
heat input in kW.
Summary of Contents for HRX515
Page 37: ...PART III OPERATION 37 Fig 18 ...
Page 47: ...PART IV MAINTENANCE 47 11 0 BURNER EXPLODED VIEW NOTE combustion head is indicative only ...
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......